iPROS Manufacturing
  • Search for products by classification category

    • Electronic Components and Modules
      Electronic Components and Modules
      56009items
    • Machinery Parts
      Machinery Parts
      70961items
    • Manufacturing and processing machinery
      Manufacturing and processing machinery
      95548items
    • Scientific and Physics Equipment
      Scientific and Physics Equipment
      33048items
    • Materials
      Materials
      34933items
    • Measurement and Analysis
      Measurement and Analysis
      52779items
    • Image Processing
      Image Processing
      14553items
    • Control and Electrical Equipment
      Control and Electrical Equipment
      50366items
    • Tools, consumables, and supplies
      Tools, consumables, and supplies
      62959items
    • Design and production support
      Design and production support
      11717items
    • IT/Network
      IT/Network
      40477items
    • Office
      Office
      13184items
    • Business support services
      Business support services
      32021items
    • Seminars and Skill Development
      Seminars and Skill Development
      5711items
    • Pharmaceutical and food related
      Pharmaceutical and food related
      23691items
    • others
      59686items
  • Search for companies by industry

    • Manufacturing and processing contract
      7354
    • others
      5041
    • Industrial Machinery
      4431
    • Machine elements and parts
      3291
    • Other manufacturing
      2872
    • IT/Telecommunications
      2521
    • Trading company/Wholesale
      2454
    • Industrial Electrical Equipment
      2316
    • Building materials, supplies and fixtures
      1818
    • software
      1645
    • Electronic Components and Semiconductors
      1576
    • Resin/Plastic
      1493
    • Service Industry
      1410
    • Testing, Analysis and Measurement
      1131
    • Ferrous/Non-ferrous metals
      980
    • environment
      702
    • Chemical
      630
    • Automobiles and Transportation Equipment
      558
    • Printing Industry
      506
    • Information and Communications
      434
    • Consumer Electronics
      422
    • Energy
      321
    • Rubber products
      311
    • Food Machinery
      303
    • Optical Instruments
      282
    • robot
      274
    • fiber
      250
    • Paper and pulp
      232
    • Electricity, Gas and Water Industry
      172
    • Pharmaceuticals and Biotechnology
      166
    • Warehousing and transport related industries
      145
    • Glass and clay products
      142
    • Food and Beverage
      134
    • CAD/CAM
      122
    • retail
      111
    • Educational and Research Institutions
      107
    • Medical Devices
      101
    • Ceramics
      96
    • wood
      88
    • Transportation
      83
    • Petroleum and coal products
      61
    • Medical and Welfare
      61
    • Shipbuilding and heavy machinery
      52
    • Aviation & Aerospace
      47
    • Fisheries, Agriculture and Forestry
      39
    • self-employed
      23
    • Public interest/special/independent administrative agency
      22
    • equipment
      20
    • Mining
      17
    • Research and development equipment and devices
      17
    • Materials
      16
    • Government
      15
    • Finance, securities and insurance
      13
    • Individual
      10
    • Restaurants and accommodations
      8
    • cosmetics
      8
    • Police, Fire Department, Self-Defense Forces
      7
    • Laboratory Equipment and Consumables
      3
    • Contracted research
      3
    • Raw materials for reagents and chemicals
      2
  • Special Features
  • Ranking

    • Overall Products Ranking
    • Overall Company Ranking
Search for Products
  • Search for products by classification category

  • Electronic Components and Modules
  • Machinery Parts
  • Manufacturing and processing machinery
  • Scientific and Physics Equipment
  • Materials
  • Measurement and Analysis
  • Image Processing
  • Control and Electrical Equipment
  • Tools, consumables, and supplies
  • Design and production support
  • IT/Network
  • Office
  • Business support services
  • Seminars and Skill Development
  • Pharmaceutical and food related
  • others
Search for Companies
  • Search for companies by industry

  • Manufacturing and processing contract
  • others
  • Industrial Machinery
  • Machine elements and parts
  • Other manufacturing
  • IT/Telecommunications
  • Trading company/Wholesale
  • Industrial Electrical Equipment
  • Building materials, supplies and fixtures
  • software
  • Electronic Components and Semiconductors
  • Resin/Plastic
  • Service Industry
  • Testing, Analysis and Measurement
  • Ferrous/Non-ferrous metals
  • environment
  • Chemical
  • Automobiles and Transportation Equipment
  • Printing Industry
  • Information and Communications
  • Consumer Electronics
  • Energy
  • Rubber products
  • Food Machinery
  • Optical Instruments
  • robot
  • fiber
  • Paper and pulp
  • Electricity, Gas and Water Industry
  • Pharmaceuticals and Biotechnology
  • Warehousing and transport related industries
  • Glass and clay products
  • Food and Beverage
  • CAD/CAM
  • retail
  • Educational and Research Institutions
  • Medical Devices
  • Ceramics
  • wood
  • Transportation
  • Petroleum and coal products
  • Medical and Welfare
  • Shipbuilding and heavy machinery
  • Aviation & Aerospace
  • Fisheries, Agriculture and Forestry
  • self-employed
  • Public interest/special/independent administrative agency
  • equipment
  • Mining
  • Research and development equipment and devices
  • Materials
  • Government
  • Finance, securities and insurance
  • Individual
  • Restaurants and accommodations
  • cosmetics
  • Police, Fire Department, Self-Defense Forces
  • Laboratory Equipment and Consumables
  • Contracted research
  • Raw materials for reagents and chemicals
Special Features
Ranking
  • Overall Products Ranking
  • Overall Company Ranking
  • privacy policy
  • terms of service
  • About Us
  • Careers
  • Advertising
  1. Home
  2. Ferrous/Non-ferrous metals
  3. 雄健工業 東京支店
  4. Product/Service List
Ferrous/Non-ferrous metals
  • Added to bookmarks

    Bookmarks list

    Bookmark has been removed

    Bookmarks list

    You can't add any more bookmarks

    By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

    Free membership registration

雄健工業 東京支店

EstablishmentAugust 1977
capital10000Ten thousand
number of employees77
addressTokyo/Minato-ku/2-2-2 Shiba Daimon, 8th Floor, Shiba Daimon Sanwa Building
phone03-3433-7188
  • Official site
last updated:Aug 04, 2025
雄健工業logo
  • Contact this company

    Contact Us Online
  • Company information
  • Products/Services(35)
  • catalog(1)
  • news(0)

雄健工業 List of Products and Services

  • category

1~35 item / All 35 items

Displayed results

class="retina-image"

【Construction Achievements of Parking Lots for Amusement Stores】Self-Contained Multi-Story Parking Lot Yuuken Park (5)

Installed surveillance cameras and lightning rods! Ensured pedestrian safety and convenience at the stairs and crosswalk.

We would like to introduce a case study of the self-parking facility, Yuuken Park. This self-parking lot is designed to fit a non-rectangular site shape. Surveillance cameras and lightning rods have been installed on the outdoor light poles of the rooftop level. Guidance to the elevator ensures pedestrian safety and convenience through stairs and crosswalks. 【Overview】 ■ Completion Date: August 31, 2015 ■ Location: Daito City, Osaka Prefecture ■ Type: 5-story, 6-tier continuous sloping floor ■ Purpose: For amusement stores ■ Construction Area: 10,170.34 m² ■ Capacity: 408 vehicles *For more details, please refer to the PDF document or feel free to contact us.

  • others

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

【Construction Achievements of Parking Lots for Amusement Stores】 Self-Contained Multi-Story Parking Lot Yuuken Park (4)

Spacious car lanes and parking spaces! We have adopted a flat-style gentle slope ramp.

We would like to introduce a case study of the self-driving multi-story parking lot, Yuuken Park. This is a store-attached parking lot that adopts a flat type with a gentle sloping ramp. The ramp has a gentle incline of 12%. The floor features a brushed finish, and the internal steel framework is color-coded according to the levels to match the car stops. 【Overview】 ■ Completion date: November 30, 2015 ■ Location: Nagoya City, Aichi Prefecture ■ Type: 6-story, 7-level store-attached (individually certified) ■ Purpose: For amusement stores ■ Construction area: 24,648.89 m² ■ Capacity: 870 vehicles *For more details, please refer to the PDF document or feel free to contact us.

  • others

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

【Construction Achievements of Parking Lots for Amusement Stores】 Self-Contained Multi-Story Parking Lot Yuuken Park (3)

Spacious intermediate and rooftop floors! We present a case study of the self-parking multi-story parking garage at Mega M's 1121 Nishioka Store.

Here is an introduction to the construction case of the self-parking multi-story parking lot, Yuuken Park. It is a self-parking multi-story parking lot accessible from the first and second floors. The stairs are equipped with anti-slip measures, and both the intermediate and rooftop floors are spacious. Additionally, LED lighting has been adopted for the outdoor lights. 【Overview】 ■ Completion date: March 31, 2016 ■ Location: Sapporo City, Hokkaido ■ Type: 4-story, 5-tier continuous sloped floor type (snow load specification) ■ Purpose: For amusement stores ■ Construction area: 10,218.06 m² ■ Capacity: 459 vehicles *For more details, please refer to the PDF document or feel free to contact us.

  • others

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

【Construction Achievements of Parking Lots for Game Centers】 Self-Contained Multi-Story Parking Lot Yuuken Park (2)

Utilizing the elevation differences of the site! We will introduce the construction case of the self-propelled multi-story parking lot at Ogiya Tarumi Store.

We would like to introduce a case study of the self-driving multi-story parking lot, Yuuken Park. Utilizing the elevation differences of the site, the parking structure has its entrance and exit on the second floor due to the height variation. To ensure pedestrian safety, a crosswalk has been established in front of the entrance to the elevator tower. Additionally, the colors of the columns and the car stops are used to differentiate the floors. 【Overview】 ■ Completion Date: October 31, 2016 ■ Location: Kobe City, Hyogo Prefecture ■ Type: 4-story, 5-tier continuous sloping floor type ■ Purpose: For amusement stores ■ Construction Area: 13,187.08 m² ■ Capacity: 613 vehicles *For more details, please refer to the PDF document or feel free to contact us.

  • others

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

【Construction Achievements of Parking Lots for Amusement Stores】 Self-Contained Multi-Story Parking Lot Yuuken Park (1)

Lighting has been installed on the roof of the stairwell building! We will introduce a case study of a gently sloped continuous inclined floor parking lot.

We would like to introduce a case study of the self-driving multi-story parking lot, Yuuken Park. This is a low-slope continuous inclined floor type that utilizes the terrain along the national highway bypass. The exterior walls feature a calm two-tone color, and the stairwell is adorned with aluminum louvers. A staircase leading to the elevator shaft has been installed in the intermediate section of the rooftop. Additionally, lighting has been installed on the roof of the stairwell. 【Overview】 ■ Completion date: April 25, 2017 ■ Location: Kurashiki City, Okayama Prefecture ■ Type: 3-story, 4-level continuous inclined floor type ■ Purpose: For amusement stores ■ Construction area: 7,175.20 m² ■ Capacity: 352 vehicles *For more details, please refer to the PDF document or feel free to contact us.

  • others

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

【Construction Achievements of Parking Lots for Apartment Buildings】 Self-park Multi-story Parking Yuuken Park (5)

Using perforated folding panels on the exterior! Here is a case study of a self-parking facility for a condominium in Tsukuba City.

We would like to introduce a case study of the self-driving multi-story parking lot, Yuuken Park. By using perforated folded plates for the exterior walls, we achieved a highly open parking facility. The side facing the apartment building was finished in a chic brown-colored panel. 【Overview】 ■ Completion Date: March 26, 2015 ■ Location: Tsukuba City, Ibaraki Prefecture ■ Type: 4-story, 5-tier continuous sloped parking system ■ Purpose: For residential use ■ Construction Area: 7,390.24 m² ■ Capacity: 332 vehicles *For more details, please refer to the PDF document or feel free to contact us.

  • others

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

【Construction Achievements of Parking Lots for Apartment Buildings】 Self-parking Multi-story Parking Lot Yuuken Park (4)

Introducing a case study of a self-parking lot for apartments surrounded by security fences for safety!

We would like to introduce a case study of the self-driving multi-story parking lot, Yuuken Park. It has been finished with a chic color fence that matches the exterior of the apartment building. The doors leading to the external stairs of the elevator shafts on each floor display the floor number. The stairs are equipped with non-slip surfaces. Additionally, for safety reasons, a prevention fence has been installed under the structural floor of the first floor. 【Overview】 ■ Completion Date: May 29, 2015 ■ Location: Kasuya District, Fukuoka Prefecture ■ Type: 4-story, 5-tier continuous sloped parking system ■ Use: For residential apartments ■ Construction Area: 4,667.58 m² ■ Capacity: 258 vehicles *For more details, please refer to the PDF document or feel free to contact us.

  • others

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

【Construction Achievements of Parking Lots for Apartment Complexes】 Self-Parking Multi-Story Parking Lot Yuuken Park (3)

The lighting on the rooftop level is selected to use fixtures that are not visible from the outside! We will introduce examples of construction for tenant-exclusive parking lots.

We would like to introduce a case study of the self-driving multi-story parking lot, Yuuken Park. This is a parking lot exclusively for residents, surrounded by residential buildings and commercial facilities. To avoid steps on the first floor of the parking lot, a pedestrian ramp has been installed. For the lighting on the rooftop level, fixtures that are not visible from the outside were selected and installed at the back of the parking spaces. Additionally, some colors of the urethane-coated waterproofing on the rooftop floor have been changed for design purposes. 【Overview】 ■ Completion Date: March 10, 2017 ■ Location: Fukuoka City, Fukuoka Prefecture ■ Type: 5-story, 6-tier continuous sloping floor ■ Purpose: For residential use ■ Construction Area: 6,979.50 m² ■ Capacity: 293 vehicles *For more details, please refer to the PDF document or feel free to contact us.

  • others

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

【Construction Achievements of Parking Lots for Apartment Buildings】 Self-park Multi-story Parking Yuuken Park (2)

Introducing efficient vertical parking! We will showcase construction examples of self-parking facilities for condominiums in Kitakyushu City.

We would like to introduce a case study of the self-driving multi-story parking lot, Yuuken Park. This is a flat-type parking lot that incorporates efficient vertical parking. A canopy has been added to the outer perimeter where people enter and exit. The layout of the parking spaces maximizes the use of the site, and a roof has been provided for the stairs and the passage to the main building of the apartment. 【Overview】 ■ Completion date: March 22, 2019 ■ Location: Kitakyushu City, Fukuoka Prefecture ■ Type: 1-layer, 2-level flat type ■ Purpose: For residential apartments ■ Construction area: 1,072.01 m² ■ Capacity: 105 vehicles *For more details, please refer to the PDF materials or feel free to contact us.

  • others

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Construction achievements for parking lots in residential buildings: Yuuken Park (1) multi-story parking lot.

Installation of equipment such as distribution boards in dead space! Introducing a construction case of a parking lot for apartment buildings in Sendai City.

We would like to introduce a case study of the self-driving multi-story parking lot, Yuuken Park. This is a parking lot for a residential complex, featuring an exterior wall painted in a gradient of brown tones. An elevator shaft has been installed closer to the apartment building, and equipment such as distribution boards has been placed in the dead space under the stairs. To consider the neighbors, openings have been minimized to reduce light intrusion. 【Overview】 ■ Completion Date: March 31, 2020 ■ Location: Sendai City, Miyagi Prefecture ■ Type: 2-layer, 3-tier continuous sloped floor type ■ Purpose: For residential complexes ■ Construction Area: 2,244.67 m² ■ Capacity: 143 vehicles *For more details, please refer to the PDF document or feel free to contact us.

  • others

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[Attraction Construction Achievements] Self-Driving Multi-Story Parking Lot Yuuken Park (5)

The exterior features a combination of aluminum louvers and decorative panels! The parking area has a clean look with few support braces.

Here are the construction examples of the self-driving multi-story parking lot, Yuuken Park. It is a store-attached parking lot designed with aluminum louvers and decorative panels on the exterior, allowing for glimpses of greenery. The ramp features a central line and pole cones for safety considerations. Planters with plantings were created using fall prevention fences. The interior of the parking lot is neat with few supports. 【Overview】 ■ Completion Date: March 26, 2017 ■ Location: Yokohama City, Kanagawa Prefecture ■ Type: 5-story, 6-level store-attached (individually certified) ■ Purpose: Customer attraction ■ Construction Area: 3,618.76 m² ■ Capacity: 85 vehicles *For more details, please refer to the PDF document or feel free to contact us.

  • others

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

【Customer Attraction Construction Achievements】 Self-Driving Multi-Story Parking Lot Yuuken Park (4)

The entrance from the parking lot to the elevator building is installed every half floor! We will introduce examples of construction for commercial and public facility multi-story parking lots.

We would like to introduce a case study of the self-driving multi-story parking lot, Yuuken Park. This parking lot is connected to commercial and public facilities via a pedestrian deck. The entrances to the elevator shaft are installed every half floor. The section facing the adjacent square employs a wire-based wall greening method. 【Overview】 ■ Completion Date: April 28, 2017 ■ Location: Aichi Prefecture ■ Type: 4-story, 5-tier skip floor type ■ Purpose: For attracting customers ■ Construction Area: 6,198.05 m² ■ Capacity: 273 vehicles *For more details, please refer to the PDF document or feel free to contact us.

  • others

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

【Customer Attraction Construction Results】 Self-Driving Multi-Story Parking Lot Yuuken Park (3)

By combining two ramps for ascending and descending, we have achieved a one-way parking lot!

We would like to introduce a case study of the self-driving multi-story parking lot, Yuuken Park. This parking lot features two ramps for ascending and descending, allowing for one-way traffic. The exterior walls are made of metallic brown steel plates. Fire hatches are installed on all floors except the first and the rooftop. Additionally, the north and west sides of the parking lot are covered with soundproof walls to consider the neighboring area. 【Overview】 ■ Completion Date: September 15, 2017 ■ Location: Chofu City, Tokyo ■ Type: 5 stories, 6 levels, individually certified ■ Purpose: For attracting customers ■ Construction Area: 5,773.00 m² ■ Capacity: 204 vehicles *For more details, please refer to the PDF document or feel free to contact us.

  • others

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[Attraction Construction Achievements] Self-Driving Multi-Story Parking Lot Yuuken Park (2)

Part of the exterior wall is constructed with louvers! Here we introduce a case study of the MIHO MUSEUM multi-story parking lot.

We would like to introduce a case study of the self-driving multi-story parking lot, Yuuken Park. To ensure that cherry blossoms can be seen from the parking lot in spring, part of the exterior wall was constructed with louvers. The exterior wall is finished with colored steel plates and louvers, and extruded cement boards were installed around the columns. Lines, parking stops, the entrance and exit of the elevator shaft, and stair doors are color-coded on each floor. 【Overview】 ■ Completion Date: March 15, 2019 ■ Location: Koka City, Shiga Prefecture ■ Type: 4-story, 5-level flat type ■ Purpose: For attracting customers ■ Construction Area: 6,386.84 m² ■ Capacity: 256 vehicles *For more details, please refer to the PDF document or feel free to contact us.

  • others

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

【Customer Attraction Construction Results】 Self-Driving Multi-Story Parking Lot Yuuken Park (1)

We will introduce a case study of a self-propelled multi-story parking lot that maximizes the effective use of the site with a continuous sloped floor design!

We would like to introduce a case study of the self-parking multi-story parking lot, Yuuken Park. It is a self-parking multi-story parking lot with stores on the 1st and 2nd floors. The construction area is 9,189.01 m², with a capacity of 253 vehicles. It features a continuous inclined floor design, maximizing the effective use of the site. 【Overview】 ■ Completion date: October 31, 2019 ■ Location: Sumida Ward, Tokyo ■ Type: 5 levels, 6 tiers with stores (individually certified) ■ Purpose: For attracting customers and hourly rental ■ Construction area: 9,189.01 m² ■ Capacity: 253 vehicles *For more details, please refer to the PDF document or feel free to contact us.

  • others

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[For Employees / Business Construction Achievements] Self-Driving Multi-Story Parking Lot Yuuken Park (5)

To enhance the visibility of oncoming vehicles, we have installed rotating lights! Here is a case study of the construction in the employee parking lot in Mito City.

We would like to introduce a case study of the self-driving multi-story parking lot, Yuuken Park. We maximized the number of vehicles within the limited site area. In addition to height, weight, and speed restrictions, we installed operational awareness signage at the parking lot entrance. Due to height restrictions, the rooftop exterior wall was designed with a lattice railing. Furthermore, considering the neighbors, the stairs were finished with concrete instead of checker plates. 【Overview】 ■ Completion Date: January 31, 2016 ■ Location: Mito City, Ibaraki Prefecture ■ Type: 3-layer, 4-tier flat type ■ Purpose: Employee and business use ■ Construction Area: 2,160.25 m² ■ Capacity: 85 vehicles *For more details, please refer to the PDF document or feel free to contact us.

  • others

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[For Employees / Business Construction Achievements] Self-Driving Multi-Story Parking Lot Yuuken Park (4)

Install a blind on the straight staircase! A two-layer, three-step employee parking lot with a linear slope.

We would like to introduce a case study of the self-driving multi-story parking lot, Yuuken Park. This is a two-layer, three-tier employee parking lot with a linear ramp. The ramp has a straight structure that allows direct access to the rooftop level. Since it is an employee parking lot, the parking spaces are arranged in a single line, and LED lighting illuminates the pedestrian walkway, along with privacy screens installed on the straight staircase. 【Overview】 ■ Completion Date: October 25, 2017 ■ Location: Nishinomiya City, Hyogo Prefecture ■ Type: Two-layer, three-tier flat type ■ Use: Employee and business use ■ Construction Area: 1,979.89 m² ■ Capacity: 108 vehicles *For more details, please refer to the PDF document or feel free to contact us.

  • others

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[For Employees / Business Construction Achievements] Self-Driving Multi-Story Parking Lot Yuken Park (3)

Snowy specification roofed parking lot! A snow protection net has been installed to prevent wind and snow from the west side.

We would like to introduce a case study of the self-driving multi-story parking lot, Yuuken Park. A eaves gutter was installed on the roof, and a snow protection net was set up to prevent wind and snow from the west side. Due to the heavy snowfall in the area, the parking section is covered by a roof. The stairs are equipped with a snow prevention roof and snow protection net, and the first floor is operated as a time-limited parking area, with entrances and exits located on the east and north sides. 【Overview】 ■ Completion date: May 1, 2018 ■ Location: Sapporo City, Hokkaido ■ Type: One-layer, two-tier roof (heavy snow specification) ■ Use: Employee and business use ■ Construction area: 928.26 m² ■ Capacity: 38 vehicles *For more details, please refer to the PDF document or feel free to contact us.

  • others

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[For Employees / Business Construction Achievements] Self-Driving Multi-Story Parking Lot Yuuken Park (2)

A traffic light has also been installed in front of the slope! Introducing a construction case of the NTT Toyota Uji store's multi-story parking lot.

We would like to introduce a case study of the self-driving multi-story parking lot, Yuuken Park. To serve as a shared garage for the adjacent Store No. 2, we installed a cross-entry pathway and considered security measures for access to the upper floors, including shutters and external staircase doors. For stock purposes and to allow usage without area restrictions, the car stops are made of square pipe specifications, and a traffic light has also been installed in front of the ramp. 【Overview】 ■ Completion date: September 20, 2018 ■ Location: Uji City, Kyoto Prefecture ■ Type: 3-layer, 4-tier flat type ■ Use: Employee and business use ■ Construction area: 2,269.00 m² ■ Capacity: 107 vehicles *For more details, please refer to the PDF document or feel free to contact us.

  • others

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[For Employees / Business Construction Achievements] Self-Driving Multi-Story Parking Lot Yuuken Park (1)

Securing parking spaces to fit the site! Here are examples of construction for individually certified parking lots with stores in Fukuoka City.

We would like to introduce a case study of the self-driving multi-story parking lot, Yuuken Park. The first floor consists of a maintenance area and an office, while the second floor features a parking lot with individually certified stores. The parking capacity is 98 vehicles, and the construction area is 4,575.08 m². We secured parking spaces to fit the site. 【Overview】 ■ Completion date: July 8, 2019 ■ Location: Fukuoka City, Fukuoka Prefecture ■ Type: 6-story, 7-level store-attached (individually certified) ■ Purpose: For employees and business use ■ Construction area: 4,575.08 m² ■ Parking capacity: 98 vehicles *For more details, please refer to the PDF document or feel free to contact us.

  • others

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Time-limited parking lot construction achievements: Self-parking multi-story parking lot Yuuken Park (5)

Maximizing the use of transformed terrain! Introducing the construction case of NPC Kyobashi Station Front Parking.

Here is an introduction to the construction case of the self-driving multi-story parking lot, Yuuken Park. It is a individually certified parking lot that makes the most of the irregular land shape. A center line has been applied to the ramp. The rooftop level and the entrance of the elevator shaft feature sliding doors. Due to the irregularly shaped site, the design connects two parking structures. 【Overview】 ■ Completion Date: July 21, 2016 ■ Location: Osaka City, Osaka Prefecture ■ Type: 4-story, 5-tier continuous sloped parking (individually certified) ■ Use: Hourly rental ■ Construction Area: 4,799.20 m² ■ Capacity: 206 vehicles *For more details, please refer to the PDF document or feel free to contact us.

  • others

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Time-limited parking lot construction achievements: Self-parking multi-story parking lot Yuuken Park (4)

Entrance and exit with maximum width secured! Introducing a construction case of the Keisei Narita Station parking lot.

We would like to introduce a case study of the self-driving multi-story parking lot, Yuuken Park. It is a parking facility that excels in convenience with its spacious environment and high-spec equipment. The entrance and exit have been designed to maximize width, connected directly to the station via a barrier-free accessible corridor. A vehicle number recognition system and pre-payment machines have been installed (with a left-side ticket machine for foreign cars), and some parking spaces accommodate long and wide spans. 【Overview】 ■ Completion Date: October 31, 2016 ■ Location: Narita City, Chiba Prefecture ■ Type: 5-story, 6-level continuous sloping floor (individually certified) ■ Purpose: Hourly rental ■ Construction Area: 10,314.16 m² ■ Capacity: 445 vehicles *For more details, please refer to the PDF document or feel free to contact us.

  • others

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Time-limited parking lot construction achievements: Self-parking multi-story parking lot Yuuken Park (3)

Bright staircase enclosed with louvers! Introducing the construction example of NPC 24H Hamamatsu Chitose-cho Parking.

Here is an introduction to the construction case of the self-driving multi-story parking lot, Yuuken Park. To alleviate congestion, the entrance features two lanes for parking. The stairwell is enclosed with metallic silver louvers, and the sidewalk facing the street has been landscaped. The continuous sloped floor design efficiently arranges the parking spaces. 【Overview】 ■ Completion Date: May 31, 2018 ■ Location: Hamamatsu City, Shizuoka Prefecture ■ Type: 4 levels, 5 tiers continuous sloped floor ■ Purpose: Hourly rental ■ Construction Area: 7,149.50 m² ■ Capacity: 344 vehicles *For more details, please refer to the PDF document or feel free to contact us.

  • others

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Time-limited parking lot construction achievements: Self-parking multi-story parking lot Yuuken Park (2)

Floors 1 to 2 are stores, and from the 3rd floor to the roof, it is a parking lot! Here are examples of construction for self-parking multi-story parking garages.

We would like to introduce a case study of the self-parking multi-story parking lot, Yuuken Park. It is a self-parking multi-story parking lot with stores on the 1st and 2nd floors. The entrance and exit of the 3rd-floor parking lot features gate-type parking equipment. It utilizes a continuous inclined floor system, maximizing the effective use of the site. 【Overview】 ■ Completion Date: October 31, 2019 ■ Location: Sumida Ward, Tokyo ■ Type: 5 levels, 6 tiers with stores (individually certified) ■ Purpose: For attracting customers and hourly rental ■ Construction Area: 9,189.01 m² ■ Capacity: 253 vehicles *For more details, please refer to the PDF document or feel free to contact us.

  • others

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Time-limited parking lot construction achievements: Self-parking multi-story parking lot Yuken Park (1)

A continuous sloped floor with a gentle gradient! Here are examples of construction for time-limited parking lots in Hamamatsu City.

We would like to introduce a case study of the self-driving multi-story parking lot, Yuuken Park. This is a time-based parking lot with ample space for families with children. The entrance and exit of the parking lot are adorned with louvers, and it features a gently sloping continuous inclined floor. Additionally, the fifth floor, designed for families with children, has a bright elevator hall decorated with illustrations for young children. The width of the parking spaces is 1.5 times the standard size. 【Overview】 ■ Completion Date: May 30, 2020 ■ Location: Hamamatsu City, Shizuoka Prefecture ■ Type: 5-story, 6-tier continuous inclined floor ■ Purpose: Time-based rental ■ Construction Area: 6,265.02 m² ■ Capacity: 262 vehicles *For more details, please refer to the PDF document or feel free to contact us.

  • others

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Public Parking Lot Construction Achievements: Self-Contained Multi-Story Parking Lot Yuuken Park (5)

A parking lot that emphasizes landscape and safety, allowing direct access to each floor from the internal roads!

We would like to introduce a case study of the self-driving multi-story parking lot, Yuuken Park. The rooftop level is usually available for parking, but this property has a roof specification. To promote energy efficiency, solar panels and green wall landscaping have been installed, and an automatic watering system has been set up to supply water to the planters in case they lack moisture. Additionally, a buzzer to notify when a vehicle is leaving and a vehicle control system that can detect the number of parked cars have been implemented. [Overview] - Completion Date: November 30, 2012 - Location: Morioka City, Iwate Prefecture - Type: 4-layer, 5-tier flat type - Use: Public (public works) - Construction Area: 3,454.75 m² - Capacity: 152 vehicles *For more details, please refer to the PDF document or feel free to contact us.

  • others

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Public Parking Lot Construction Achievements: Self-Contained Multi-Story Parking Lot Yuuken Park (4)

Time-limited multi-use parking lot! The rooftop exterior lights use LED lighting for energy conservation.

We would like to introduce a case study of the self-driving multi-story parking lot, Yuuken Park. This multi-story parking lot was developed to accommodate a concentrated influx of vehicles from health check-up visitors, and it operates as a time-based rental facility. To ensure pedestrian safety, a barrier was installed next to the payment machine at the first-floor entrance. The parking lot features a skip design, making it easy for anyone to park, and part of the exterior wall has been greened. Additionally, LED lighting has been adopted for the outdoor lights on the rooftop to save energy. 【Overview】 ■ Completion Date: December 25, 2014 ■ Location: Kakogawa City, Hyogo Prefecture ■ Type: 4 levels, 5 tiers skip-type ■ Purpose: Public use (public works) ■ Construction Area: 3,404.06 m² ■ Capacity: 100 vehicles *For more details, please refer to the PDF document or feel free to contact us.

  • others

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Public Parking Lot Construction Achievements: Self-Contained Multi-Story Parking Lot Yuuken Park (3)

On the first floor, there is the "Odawara Citizen Exchange Center." We will introduce examples of construction using traditional methods for stores with parking lots.

We would like to introduce a case study of the self-driving multi-story parking lot, Yuuken Park. This is a conventional construction method parking lot with attached facilities such as a "Citizen Activity Plaza" and conference rooms on the first floor. Since it exceeds a total length of 100 meters, stairs leading to the elevator are provided in the central part of each floor. Additionally, due to the conventional construction method, fireproof coverings and fixed fire extinguishing equipment, which are not required for certified methods, have been installed. 【Overview】 ■ Completion Date: October 31, 2015 ■ Location: Odawara City, Kanagawa Prefecture ■ Type: 5-story, 6-tier continuous inclined floor type (1st floor facilities) ■ Purpose: Public use (public works) ■ Construction Area: 12,255.36 m² ■ Capacity: 368 vehicles *For more details, please refer to the PDF document or feel free to contact us.

  • others

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Public Parking Lot Construction Achievements: Self-Contained Multi-Story Parking Lot Yuuken Park (2)

The backside also has a flat parking lot! We will introduce a construction example of the Maruyama Park No. 2 parking lot.

We would like to introduce a case study of the self-driving multi-story parking lot, Yuuken Park. Utilizing the slope of the site, we created a water gradient in the longitudinal direction. On the backside, we also secured a flat parking area. The long parking lot follows the shape of the site and includes a ball protection net from the adjacent Maruyama Baseball Stadium. 【Overview】 ■ Completion Date: March 24, 2016 ■ Location: Sapporo City, Hokkaido ■ Type: 2-layer, 3-tier flat type (snow-heavy specification) ■ Purpose: Public use (public works) ■ Construction Area: 4,136.74 m² ■ Capacity: 191 vehicles *For more details, please refer to the PDF document or feel free to contact us.

  • others

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Public Parking Lot Construction Achievements: Self-Contained Multi-Story Parking Lot Yuken Park (1)

For public facility users! Here are examples of construction for the Tagajo Station South Multi-Storey Parking Lot.

We would like to introduce a case study of the self-driving multi-story parking lot, Yuuken Park. This is a 5-story, 6-level continuous sloped parking facility for public facility users. An elevator building for parking users is located near the south exit of Tagajo Station. The second floor is equipped with a restroom for people with disabilities, and there is also a turning space for one car. 【Overview】 ■ Completion Date: March 31, 2016 ■ Location: Tagajo City, Miyagi Prefecture ■ Type: 5-story, 6-level continuous sloped ■ Purpose: For public facility users ■ Construction Area: 7,982.61 m² ■ Capacity: 351 cars *For more details, please refer to the PDF document or feel free to contact us.

  • others

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Self-driving multi-story parking lot, 1st floor, 2-tier parking lot (certified by the Minister of Land, Infrastructure, Transport and Tourism)

Self-driving multi-story parking lot, 1st floor, 2-tier parking lot (certified by the Minister of Land, Infrastructure, Transport and Tourism)

This is a basic type of self-parking facility. It moves to the upper floors by climbing a slope of 17% or less. 【Features】 ○ Concrete floor, steel floor ○ Maximum capacity of approximately 350 vehicles ○ Maximum total floor area of 4,000m2 ○ The steel floor is the only certified one in the industry. ○ It is also suitable for heavy snowfall areas. ● For other functions and details, please download the catalog.

  • others

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Self-driving multi-story parking lot with roof (Minister of Land, Infrastructure, Transport and Tourism certified product)

Self-driving multi-story parking lot with a roof (Certified by the Minister of Land, Infrastructure, Transport and Tourism)

This is a self-parking multi-story parking garage that protects cars from rain and snow while enhancing customer convenience. 【Features】 ○ Maximum capacity: 1 layer 2 tiers approximately 350 cars / 2 layers 3 tiers approximately 500 cars ○ Maximum total floor area: 1 layer 2 tiers 8,000m2 / 2 layers 3 tiers 12,000m2 ○ Protects cars from rain and snow. ○ Suitable for heavy snowfall areas. (The heavy snowfall model is the only certified one in the industry.) ○ The 2-layer 3-tier roofed version is certified as a fire-resistant building. ● For other functions and details, please download the catalog.

  • others

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Automated multi-story parking lot with attached store parking.

Automated multi-story parking lot with store parking.

A building that integrates a store and a parking lot becomes the "optimal store-attached parking lot" only when the layouts of both the store and the parking lot are taken into consideration. Our company will provide the best proposal from the options below based on your requests. 【Features】 ○ This is a revolutionary construction method that does not require fireproof coating, fire shutters, or foam extinguishing equipment, making it possible to construct at a significantly low cost. ○ It is a general minister-certified product that incorporates elements of fire-resistant design. Like certified parking lots, it can be constructed on any land. ○ If it does not meet fire-resistant design or certification requirements, we will plan it as a general building. We will propose an efficient building considering the layout of the store and the parking lot. ● For other functions and details, please download the catalog.

  • others

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Automated multi-story parking lot, individually certified parking lot

Self-driving multi-story parking lot, individually certified parking lot.

By using fire-resistant design that eliminates the need for fireproof coverings, fire shutters, and foam extinguishing equipment, we can provide low-cost parking lots that obtain individual certification. Individual certified parking lots can be constructed up to 6 layers and 7 tiers. If it does not meet the standards for general certified parking lots (e.g., 6 layers and 7 tiers parking lots, 2.5t compatible parking lots), we recommend individual certified parking lots. 【Features】 ○ Due to legal relaxations, equipment can be reduced, resulting in low costs. ○ The shape can be freely designed. ● For other functions and details, please download the catalog.

  • others

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Self-driving multi-story parking lot, 2 levels and 3 tiers (certified by the Minister of Land, Infrastructure, Transport and Tourism)

Self-driving multi-story parking lot, 2 levels and 3 tiers (certified by the Minister of Land, Infrastructure, Transport and Tourism)

It is a 2-level, 3-tier parking lot. There are three types: flat type (the basic type among self-parking lots, where you move to the upper level by going up a slope of 17% or less), flat step type (a type where you go up one floor at a time), and continuous sloping floor type (a type that spirals up with a gradient of 4% or less. Since the vehicle path also serves as the slope, the area per vehicle is minimized). 【Features】 ○ Types: Flat type, Flat step type, Continuous sloping floor type ○ Floor: Concrete floor, Steel floor ○ Maximum capacity: Approximately 500 vehicles ○ Maximum total floor area: 8,000 m² ● For other functions and details, please download the catalog.

  • others

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration
Prev 1 Next
  • 大型品の切削や低コストな複合加工に。ロボットシステムの資料進呈

    大型品の切削や低コストな複合加工に。ロボットシステムの資料進呈

  • 高品質×短納期 アキツなら金型費不要 0円 1個から対応可能 試作・小ロット 最短当日出荷 3Dデータ対応 ゴム切削加工はお任せください!
  • イプロスがリアル展示会を主催します! AI/DX 営業・マーケティング展 出展社募集中 リード数・商談数が止まらない!新しいリアル展示会を提供 会期 2026年3月24日(火)~25日(水) 会場 東京ビッグサイト東4ホール 出展概要資料を進呈!
    • Contact this company

      Contact Us Online

    Products

    • Search for Products

    Company

    • Search for Companies

    Special Features

    • Special Features

    Ranking

    • Overall Products Ranking
    • Overall Company Ranking

    support

    • site map
    IPROS
    • privacy policy Regarding external transmission of information
    • terms of service
    • About Us
    • Careers
    • Advertising
    COPYRIGHT © 2001-2025 IPROS CORPORATION ALL RIGHTS RESERVED.
    Please note that the English text on this page is automatically translated and may contain inaccuracies.