1~35 item / All 35 items
Displayed results
Added to bookmarks
Bookmarks listBookmark has been removed
Bookmarks listYou can't add any more bookmarks
By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.
Free membership registrationContact this company
Contact Us Online1~35 item / All 35 items
We would like to introduce a case study of the self-parking facility, Yuuken Park. This self-parking lot is designed to fit a non-rectangular site shape. Surveillance cameras and lightning rods have been installed on the outdoor light poles of the rooftop level. Guidance to the elevator ensures pedestrian safety and convenience through stairs and crosswalks. 【Overview】 ■ Completion Date: August 31, 2015 ■ Location: Daito City, Osaka Prefecture ■ Type: 5-story, 6-tier continuous sloping floor ■ Purpose: For amusement stores ■ Construction Area: 10,170.34 m² ■ Capacity: 408 vehicles *For more details, please refer to the PDF document or feel free to contact us.
Added to bookmarks
Bookmarks listBookmark has been removed
Bookmarks listYou can't add any more bookmarks
By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.
Free membership registrationWe would like to introduce a case study of the self-driving multi-story parking lot, Yuuken Park. This is a store-attached parking lot that adopts a flat type with a gentle sloping ramp. The ramp has a gentle incline of 12%. The floor features a brushed finish, and the internal steel framework is color-coded according to the levels to match the car stops. 【Overview】 ■ Completion date: November 30, 2015 ■ Location: Nagoya City, Aichi Prefecture ■ Type: 6-story, 7-level store-attached (individually certified) ■ Purpose: For amusement stores ■ Construction area: 24,648.89 m² ■ Capacity: 870 vehicles *For more details, please refer to the PDF document or feel free to contact us.
Added to bookmarks
Bookmarks listBookmark has been removed
Bookmarks listYou can't add any more bookmarks
By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.
Free membership registrationHere is an introduction to the construction case of the self-parking multi-story parking lot, Yuuken Park. It is a self-parking multi-story parking lot accessible from the first and second floors. The stairs are equipped with anti-slip measures, and both the intermediate and rooftop floors are spacious. Additionally, LED lighting has been adopted for the outdoor lights. 【Overview】 ■ Completion date: March 31, 2016 ■ Location: Sapporo City, Hokkaido ■ Type: 4-story, 5-tier continuous sloped floor type (snow load specification) ■ Purpose: For amusement stores ■ Construction area: 10,218.06 m² ■ Capacity: 459 vehicles *For more details, please refer to the PDF document or feel free to contact us.
Added to bookmarks
Bookmarks listBookmark has been removed
Bookmarks listYou can't add any more bookmarks
By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.
Free membership registrationWe would like to introduce a case study of the self-driving multi-story parking lot, Yuuken Park. Utilizing the elevation differences of the site, the parking structure has its entrance and exit on the second floor due to the height variation. To ensure pedestrian safety, a crosswalk has been established in front of the entrance to the elevator tower. Additionally, the colors of the columns and the car stops are used to differentiate the floors. 【Overview】 ■ Completion Date: October 31, 2016 ■ Location: Kobe City, Hyogo Prefecture ■ Type: 4-story, 5-tier continuous sloping floor type ■ Purpose: For amusement stores ■ Construction Area: 13,187.08 m² ■ Capacity: 613 vehicles *For more details, please refer to the PDF document or feel free to contact us.
Added to bookmarks
Bookmarks listBookmark has been removed
Bookmarks listYou can't add any more bookmarks
By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.
Free membership registrationWe would like to introduce a case study of the self-driving multi-story parking lot, Yuuken Park. This is a low-slope continuous inclined floor type that utilizes the terrain along the national highway bypass. The exterior walls feature a calm two-tone color, and the stairwell is adorned with aluminum louvers. A staircase leading to the elevator shaft has been installed in the intermediate section of the rooftop. Additionally, lighting has been installed on the roof of the stairwell. 【Overview】 ■ Completion date: April 25, 2017 ■ Location: Kurashiki City, Okayama Prefecture ■ Type: 3-story, 4-level continuous inclined floor type ■ Purpose: For amusement stores ■ Construction area: 7,175.20 m² ■ Capacity: 352 vehicles *For more details, please refer to the PDF document or feel free to contact us.
Added to bookmarks
Bookmarks listBookmark has been removed
Bookmarks listYou can't add any more bookmarks
By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.
Free membership registrationWe would like to introduce a case study of the self-driving multi-story parking lot, Yuuken Park. By using perforated folded plates for the exterior walls, we achieved a highly open parking facility. The side facing the apartment building was finished in a chic brown-colored panel. 【Overview】 ■ Completion Date: March 26, 2015 ■ Location: Tsukuba City, Ibaraki Prefecture ■ Type: 4-story, 5-tier continuous sloped parking system ■ Purpose: For residential use ■ Construction Area: 7,390.24 m² ■ Capacity: 332 vehicles *For more details, please refer to the PDF document or feel free to contact us.
Added to bookmarks
Bookmarks listBookmark has been removed
Bookmarks listYou can't add any more bookmarks
By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.
Free membership registrationWe would like to introduce a case study of the self-driving multi-story parking lot, Yuuken Park. It has been finished with a chic color fence that matches the exterior of the apartment building. The doors leading to the external stairs of the elevator shafts on each floor display the floor number. The stairs are equipped with non-slip surfaces. Additionally, for safety reasons, a prevention fence has been installed under the structural floor of the first floor. 【Overview】 ■ Completion Date: May 29, 2015 ■ Location: Kasuya District, Fukuoka Prefecture ■ Type: 4-story, 5-tier continuous sloped parking system ■ Use: For residential apartments ■ Construction Area: 4,667.58 m² ■ Capacity: 258 vehicles *For more details, please refer to the PDF document or feel free to contact us.
Added to bookmarks
Bookmarks listBookmark has been removed
Bookmarks listYou can't add any more bookmarks
By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.
Free membership registrationWe would like to introduce a case study of the self-driving multi-story parking lot, Yuuken Park. This is a parking lot exclusively for residents, surrounded by residential buildings and commercial facilities. To avoid steps on the first floor of the parking lot, a pedestrian ramp has been installed. For the lighting on the rooftop level, fixtures that are not visible from the outside were selected and installed at the back of the parking spaces. Additionally, some colors of the urethane-coated waterproofing on the rooftop floor have been changed for design purposes. 【Overview】 ■ Completion Date: March 10, 2017 ■ Location: Fukuoka City, Fukuoka Prefecture ■ Type: 5-story, 6-tier continuous sloping floor ■ Purpose: For residential use ■ Construction Area: 6,979.50 m² ■ Capacity: 293 vehicles *For more details, please refer to the PDF document or feel free to contact us.
Added to bookmarks
Bookmarks listBookmark has been removed
Bookmarks listYou can't add any more bookmarks
By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.
Free membership registrationWe would like to introduce a case study of the self-driving multi-story parking lot, Yuuken Park. This is a flat-type parking lot that incorporates efficient vertical parking. A canopy has been added to the outer perimeter where people enter and exit. The layout of the parking spaces maximizes the use of the site, and a roof has been provided for the stairs and the passage to the main building of the apartment. 【Overview】 ■ Completion date: March 22, 2019 ■ Location: Kitakyushu City, Fukuoka Prefecture ■ Type: 1-layer, 2-level flat type ■ Purpose: For residential apartments ■ Construction area: 1,072.01 m² ■ Capacity: 105 vehicles *For more details, please refer to the PDF materials or feel free to contact us.
Added to bookmarks
Bookmarks listBookmark has been removed
Bookmarks listYou can't add any more bookmarks
By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.
Free membership registrationWe would like to introduce a case study of the self-driving multi-story parking lot, Yuuken Park. This is a parking lot for a residential complex, featuring an exterior wall painted in a gradient of brown tones. An elevator shaft has been installed closer to the apartment building, and equipment such as distribution boards has been placed in the dead space under the stairs. To consider the neighbors, openings have been minimized to reduce light intrusion. 【Overview】 ■ Completion Date: March 31, 2020 ■ Location: Sendai City, Miyagi Prefecture ■ Type: 2-layer, 3-tier continuous sloped floor type ■ Purpose: For residential complexes ■ Construction Area: 2,244.67 m² ■ Capacity: 143 vehicles *For more details, please refer to the PDF document or feel free to contact us.
Added to bookmarks
Bookmarks listBookmark has been removed
Bookmarks listYou can't add any more bookmarks
By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.
Free membership registrationHere are the construction examples of the self-driving multi-story parking lot, Yuuken Park. It is a store-attached parking lot designed with aluminum louvers and decorative panels on the exterior, allowing for glimpses of greenery. The ramp features a central line and pole cones for safety considerations. Planters with plantings were created using fall prevention fences. The interior of the parking lot is neat with few supports. 【Overview】 ■ Completion Date: March 26, 2017 ■ Location: Yokohama City, Kanagawa Prefecture ■ Type: 5-story, 6-level store-attached (individually certified) ■ Purpose: Customer attraction ■ Construction Area: 3,618.76 m² ■ Capacity: 85 vehicles *For more details, please refer to the PDF document or feel free to contact us.
Added to bookmarks
Bookmarks listBookmark has been removed
Bookmarks listYou can't add any more bookmarks
By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.
Free membership registrationWe would like to introduce a case study of the self-driving multi-story parking lot, Yuuken Park. This parking lot is connected to commercial and public facilities via a pedestrian deck. The entrances to the elevator shaft are installed every half floor. The section facing the adjacent square employs a wire-based wall greening method. 【Overview】 ■ Completion Date: April 28, 2017 ■ Location: Aichi Prefecture ■ Type: 4-story, 5-tier skip floor type ■ Purpose: For attracting customers ■ Construction Area: 6,198.05 m² ■ Capacity: 273 vehicles *For more details, please refer to the PDF document or feel free to contact us.
Added to bookmarks
Bookmarks listBookmark has been removed
Bookmarks listYou can't add any more bookmarks
By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.
Free membership registrationWe would like to introduce a case study of the self-driving multi-story parking lot, Yuuken Park. This parking lot features two ramps for ascending and descending, allowing for one-way traffic. The exterior walls are made of metallic brown steel plates. Fire hatches are installed on all floors except the first and the rooftop. Additionally, the north and west sides of the parking lot are covered with soundproof walls to consider the neighboring area. 【Overview】 ■ Completion Date: September 15, 2017 ■ Location: Chofu City, Tokyo ■ Type: 5 stories, 6 levels, individually certified ■ Purpose: For attracting customers ■ Construction Area: 5,773.00 m² ■ Capacity: 204 vehicles *For more details, please refer to the PDF document or feel free to contact us.
Added to bookmarks
Bookmarks listBookmark has been removed
Bookmarks listYou can't add any more bookmarks
By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.
Free membership registrationWe would like to introduce a case study of the self-driving multi-story parking lot, Yuuken Park. To ensure that cherry blossoms can be seen from the parking lot in spring, part of the exterior wall was constructed with louvers. The exterior wall is finished with colored steel plates and louvers, and extruded cement boards were installed around the columns. Lines, parking stops, the entrance and exit of the elevator shaft, and stair doors are color-coded on each floor. 【Overview】 ■ Completion Date: March 15, 2019 ■ Location: Koka City, Shiga Prefecture ■ Type: 4-story, 5-level flat type ■ Purpose: For attracting customers ■ Construction Area: 6,386.84 m² ■ Capacity: 256 vehicles *For more details, please refer to the PDF document or feel free to contact us.
Added to bookmarks
Bookmarks listBookmark has been removed
Bookmarks listYou can't add any more bookmarks
By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.
Free membership registrationWe would like to introduce a case study of the self-parking multi-story parking lot, Yuuken Park. It is a self-parking multi-story parking lot with stores on the 1st and 2nd floors. The construction area is 9,189.01 m², with a capacity of 253 vehicles. It features a continuous inclined floor design, maximizing the effective use of the site. 【Overview】 ■ Completion date: October 31, 2019 ■ Location: Sumida Ward, Tokyo ■ Type: 5 levels, 6 tiers with stores (individually certified) ■ Purpose: For attracting customers and hourly rental ■ Construction area: 9,189.01 m² ■ Capacity: 253 vehicles *For more details, please refer to the PDF document or feel free to contact us.
Added to bookmarks
Bookmarks listBookmark has been removed
Bookmarks listYou can't add any more bookmarks
By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.
Free membership registrationWe would like to introduce a case study of the self-driving multi-story parking lot, Yuuken Park. We maximized the number of vehicles within the limited site area. In addition to height, weight, and speed restrictions, we installed operational awareness signage at the parking lot entrance. Due to height restrictions, the rooftop exterior wall was designed with a lattice railing. Furthermore, considering the neighbors, the stairs were finished with concrete instead of checker plates. 【Overview】 ■ Completion Date: January 31, 2016 ■ Location: Mito City, Ibaraki Prefecture ■ Type: 3-layer, 4-tier flat type ■ Purpose: Employee and business use ■ Construction Area: 2,160.25 m² ■ Capacity: 85 vehicles *For more details, please refer to the PDF document or feel free to contact us.
Added to bookmarks
Bookmarks listBookmark has been removed
Bookmarks listYou can't add any more bookmarks
By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.
Free membership registrationWe would like to introduce a case study of the self-driving multi-story parking lot, Yuuken Park. This is a two-layer, three-tier employee parking lot with a linear ramp. The ramp has a straight structure that allows direct access to the rooftop level. Since it is an employee parking lot, the parking spaces are arranged in a single line, and LED lighting illuminates the pedestrian walkway, along with privacy screens installed on the straight staircase. 【Overview】 ■ Completion Date: October 25, 2017 ■ Location: Nishinomiya City, Hyogo Prefecture ■ Type: Two-layer, three-tier flat type ■ Use: Employee and business use ■ Construction Area: 1,979.89 m² ■ Capacity: 108 vehicles *For more details, please refer to the PDF document or feel free to contact us.
Added to bookmarks
Bookmarks listBookmark has been removed
Bookmarks listYou can't add any more bookmarks
By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.
Free membership registrationWe would like to introduce a case study of the self-driving multi-story parking lot, Yuuken Park. A eaves gutter was installed on the roof, and a snow protection net was set up to prevent wind and snow from the west side. Due to the heavy snowfall in the area, the parking section is covered by a roof. The stairs are equipped with a snow prevention roof and snow protection net, and the first floor is operated as a time-limited parking area, with entrances and exits located on the east and north sides. 【Overview】 ■ Completion date: May 1, 2018 ■ Location: Sapporo City, Hokkaido ■ Type: One-layer, two-tier roof (heavy snow specification) ■ Use: Employee and business use ■ Construction area: 928.26 m² ■ Capacity: 38 vehicles *For more details, please refer to the PDF document or feel free to contact us.
Added to bookmarks
Bookmarks listBookmark has been removed
Bookmarks listYou can't add any more bookmarks
By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.
Free membership registrationWe would like to introduce a case study of the self-driving multi-story parking lot, Yuuken Park. To serve as a shared garage for the adjacent Store No. 2, we installed a cross-entry pathway and considered security measures for access to the upper floors, including shutters and external staircase doors. For stock purposes and to allow usage without area restrictions, the car stops are made of square pipe specifications, and a traffic light has also been installed in front of the ramp. 【Overview】 ■ Completion date: September 20, 2018 ■ Location: Uji City, Kyoto Prefecture ■ Type: 3-layer, 4-tier flat type ■ Use: Employee and business use ■ Construction area: 2,269.00 m² ■ Capacity: 107 vehicles *For more details, please refer to the PDF document or feel free to contact us.
Added to bookmarks
Bookmarks listBookmark has been removed
Bookmarks listYou can't add any more bookmarks
By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.
Free membership registrationWe would like to introduce a case study of the self-driving multi-story parking lot, Yuuken Park. The first floor consists of a maintenance area and an office, while the second floor features a parking lot with individually certified stores. The parking capacity is 98 vehicles, and the construction area is 4,575.08 m². We secured parking spaces to fit the site. 【Overview】 ■ Completion date: July 8, 2019 ■ Location: Fukuoka City, Fukuoka Prefecture ■ Type: 6-story, 7-level store-attached (individually certified) ■ Purpose: For employees and business use ■ Construction area: 4,575.08 m² ■ Parking capacity: 98 vehicles *For more details, please refer to the PDF document or feel free to contact us.
Added to bookmarks
Bookmarks listBookmark has been removed
Bookmarks listYou can't add any more bookmarks
By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.
Free membership registrationHere is an introduction to the construction case of the self-driving multi-story parking lot, Yuuken Park. It is a individually certified parking lot that makes the most of the irregular land shape. A center line has been applied to the ramp. The rooftop level and the entrance of the elevator shaft feature sliding doors. Due to the irregularly shaped site, the design connects two parking structures. 【Overview】 ■ Completion Date: July 21, 2016 ■ Location: Osaka City, Osaka Prefecture ■ Type: 4-story, 5-tier continuous sloped parking (individually certified) ■ Use: Hourly rental ■ Construction Area: 4,799.20 m² ■ Capacity: 206 vehicles *For more details, please refer to the PDF document or feel free to contact us.
Added to bookmarks
Bookmarks listBookmark has been removed
Bookmarks listYou can't add any more bookmarks
By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.
Free membership registrationWe would like to introduce a case study of the self-driving multi-story parking lot, Yuuken Park. It is a parking facility that excels in convenience with its spacious environment and high-spec equipment. The entrance and exit have been designed to maximize width, connected directly to the station via a barrier-free accessible corridor. A vehicle number recognition system and pre-payment machines have been installed (with a left-side ticket machine for foreign cars), and some parking spaces accommodate long and wide spans. 【Overview】 ■ Completion Date: October 31, 2016 ■ Location: Narita City, Chiba Prefecture ■ Type: 5-story, 6-level continuous sloping floor (individually certified) ■ Purpose: Hourly rental ■ Construction Area: 10,314.16 m² ■ Capacity: 445 vehicles *For more details, please refer to the PDF document or feel free to contact us.
Added to bookmarks
Bookmarks listBookmark has been removed
Bookmarks listYou can't add any more bookmarks
By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.
Free membership registrationHere is an introduction to the construction case of the self-driving multi-story parking lot, Yuuken Park. To alleviate congestion, the entrance features two lanes for parking. The stairwell is enclosed with metallic silver louvers, and the sidewalk facing the street has been landscaped. The continuous sloped floor design efficiently arranges the parking spaces. 【Overview】 ■ Completion Date: May 31, 2018 ■ Location: Hamamatsu City, Shizuoka Prefecture ■ Type: 4 levels, 5 tiers continuous sloped floor ■ Purpose: Hourly rental ■ Construction Area: 7,149.50 m² ■ Capacity: 344 vehicles *For more details, please refer to the PDF document or feel free to contact us.
Added to bookmarks
Bookmarks listBookmark has been removed
Bookmarks listYou can't add any more bookmarks
By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.
Free membership registrationWe would like to introduce a case study of the self-parking multi-story parking lot, Yuuken Park. It is a self-parking multi-story parking lot with stores on the 1st and 2nd floors. The entrance and exit of the 3rd-floor parking lot features gate-type parking equipment. It utilizes a continuous inclined floor system, maximizing the effective use of the site. 【Overview】 ■ Completion Date: October 31, 2019 ■ Location: Sumida Ward, Tokyo ■ Type: 5 levels, 6 tiers with stores (individually certified) ■ Purpose: For attracting customers and hourly rental ■ Construction Area: 9,189.01 m² ■ Capacity: 253 vehicles *For more details, please refer to the PDF document or feel free to contact us.
Added to bookmarks
Bookmarks listBookmark has been removed
Bookmarks listYou can't add any more bookmarks
By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.
Free membership registrationWe would like to introduce a case study of the self-driving multi-story parking lot, Yuuken Park. This is a time-based parking lot with ample space for families with children. The entrance and exit of the parking lot are adorned with louvers, and it features a gently sloping continuous inclined floor. Additionally, the fifth floor, designed for families with children, has a bright elevator hall decorated with illustrations for young children. The width of the parking spaces is 1.5 times the standard size. 【Overview】 ■ Completion Date: May 30, 2020 ■ Location: Hamamatsu City, Shizuoka Prefecture ■ Type: 5-story, 6-tier continuous inclined floor ■ Purpose: Time-based rental ■ Construction Area: 6,265.02 m² ■ Capacity: 262 vehicles *For more details, please refer to the PDF document or feel free to contact us.
Added to bookmarks
Bookmarks listBookmark has been removed
Bookmarks listYou can't add any more bookmarks
By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.
Free membership registrationWe would like to introduce a case study of the self-driving multi-story parking lot, Yuuken Park. The rooftop level is usually available for parking, but this property has a roof specification. To promote energy efficiency, solar panels and green wall landscaping have been installed, and an automatic watering system has been set up to supply water to the planters in case they lack moisture. Additionally, a buzzer to notify when a vehicle is leaving and a vehicle control system that can detect the number of parked cars have been implemented. [Overview] - Completion Date: November 30, 2012 - Location: Morioka City, Iwate Prefecture - Type: 4-layer, 5-tier flat type - Use: Public (public works) - Construction Area: 3,454.75 m² - Capacity: 152 vehicles *For more details, please refer to the PDF document or feel free to contact us.
Added to bookmarks
Bookmarks listBookmark has been removed
Bookmarks listYou can't add any more bookmarks
By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.
Free membership registrationWe would like to introduce a case study of the self-driving multi-story parking lot, Yuuken Park. This multi-story parking lot was developed to accommodate a concentrated influx of vehicles from health check-up visitors, and it operates as a time-based rental facility. To ensure pedestrian safety, a barrier was installed next to the payment machine at the first-floor entrance. The parking lot features a skip design, making it easy for anyone to park, and part of the exterior wall has been greened. Additionally, LED lighting has been adopted for the outdoor lights on the rooftop to save energy. 【Overview】 ■ Completion Date: December 25, 2014 ■ Location: Kakogawa City, Hyogo Prefecture ■ Type: 4 levels, 5 tiers skip-type ■ Purpose: Public use (public works) ■ Construction Area: 3,404.06 m² ■ Capacity: 100 vehicles *For more details, please refer to the PDF document or feel free to contact us.
Added to bookmarks
Bookmarks listBookmark has been removed
Bookmarks listYou can't add any more bookmarks
By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.
Free membership registrationWe would like to introduce a case study of the self-driving multi-story parking lot, Yuuken Park. This is a conventional construction method parking lot with attached facilities such as a "Citizen Activity Plaza" and conference rooms on the first floor. Since it exceeds a total length of 100 meters, stairs leading to the elevator are provided in the central part of each floor. Additionally, due to the conventional construction method, fireproof coverings and fixed fire extinguishing equipment, which are not required for certified methods, have been installed. 【Overview】 ■ Completion Date: October 31, 2015 ■ Location: Odawara City, Kanagawa Prefecture ■ Type: 5-story, 6-tier continuous inclined floor type (1st floor facilities) ■ Purpose: Public use (public works) ■ Construction Area: 12,255.36 m² ■ Capacity: 368 vehicles *For more details, please refer to the PDF document or feel free to contact us.
Added to bookmarks
Bookmarks listBookmark has been removed
Bookmarks listYou can't add any more bookmarks
By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.
Free membership registrationWe would like to introduce a case study of the self-driving multi-story parking lot, Yuuken Park. Utilizing the slope of the site, we created a water gradient in the longitudinal direction. On the backside, we also secured a flat parking area. The long parking lot follows the shape of the site and includes a ball protection net from the adjacent Maruyama Baseball Stadium. 【Overview】 ■ Completion Date: March 24, 2016 ■ Location: Sapporo City, Hokkaido ■ Type: 2-layer, 3-tier flat type (snow-heavy specification) ■ Purpose: Public use (public works) ■ Construction Area: 4,136.74 m² ■ Capacity: 191 vehicles *For more details, please refer to the PDF document or feel free to contact us.
Added to bookmarks
Bookmarks listBookmark has been removed
Bookmarks listYou can't add any more bookmarks
By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.
Free membership registrationWe would like to introduce a case study of the self-driving multi-story parking lot, Yuuken Park. This is a 5-story, 6-level continuous sloped parking facility for public facility users. An elevator building for parking users is located near the south exit of Tagajo Station. The second floor is equipped with a restroom for people with disabilities, and there is also a turning space for one car. 【Overview】 ■ Completion Date: March 31, 2016 ■ Location: Tagajo City, Miyagi Prefecture ■ Type: 5-story, 6-level continuous sloped ■ Purpose: For public facility users ■ Construction Area: 7,982.61 m² ■ Capacity: 351 cars *For more details, please refer to the PDF document or feel free to contact us.
Added to bookmarks
Bookmarks listBookmark has been removed
Bookmarks listYou can't add any more bookmarks
By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.
Free membership registrationThis is a basic type of self-parking facility. It moves to the upper floors by climbing a slope of 17% or less. 【Features】 ○ Concrete floor, steel floor ○ Maximum capacity of approximately 350 vehicles ○ Maximum total floor area of 4,000m2 ○ The steel floor is the only certified one in the industry. ○ It is also suitable for heavy snowfall areas. ● For other functions and details, please download the catalog.
Added to bookmarks
Bookmarks listBookmark has been removed
Bookmarks listYou can't add any more bookmarks
By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.
Free membership registrationThis is a self-parking multi-story parking garage that protects cars from rain and snow while enhancing customer convenience. 【Features】 ○ Maximum capacity: 1 layer 2 tiers approximately 350 cars / 2 layers 3 tiers approximately 500 cars ○ Maximum total floor area: 1 layer 2 tiers 8,000m2 / 2 layers 3 tiers 12,000m2 ○ Protects cars from rain and snow. ○ Suitable for heavy snowfall areas. (The heavy snowfall model is the only certified one in the industry.) ○ The 2-layer 3-tier roofed version is certified as a fire-resistant building. ● For other functions and details, please download the catalog.
Added to bookmarks
Bookmarks listBookmark has been removed
Bookmarks listYou can't add any more bookmarks
By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.
Free membership registrationA building that integrates a store and a parking lot becomes the "optimal store-attached parking lot" only when the layouts of both the store and the parking lot are taken into consideration. Our company will provide the best proposal from the options below based on your requests. 【Features】 ○ This is a revolutionary construction method that does not require fireproof coating, fire shutters, or foam extinguishing equipment, making it possible to construct at a significantly low cost. ○ It is a general minister-certified product that incorporates elements of fire-resistant design. Like certified parking lots, it can be constructed on any land. ○ If it does not meet fire-resistant design or certification requirements, we will plan it as a general building. We will propose an efficient building considering the layout of the store and the parking lot. ● For other functions and details, please download the catalog.
Added to bookmarks
Bookmarks listBookmark has been removed
Bookmarks listYou can't add any more bookmarks
By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.
Free membership registrationBy using fire-resistant design that eliminates the need for fireproof coverings, fire shutters, and foam extinguishing equipment, we can provide low-cost parking lots that obtain individual certification. Individual certified parking lots can be constructed up to 6 layers and 7 tiers. If it does not meet the standards for general certified parking lots (e.g., 6 layers and 7 tiers parking lots, 2.5t compatible parking lots), we recommend individual certified parking lots. 【Features】 ○ Due to legal relaxations, equipment can be reduced, resulting in low costs. ○ The shape can be freely designed. ● For other functions and details, please download the catalog.
Added to bookmarks
Bookmarks listBookmark has been removed
Bookmarks listYou can't add any more bookmarks
By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.
Free membership registrationIt is a 2-level, 3-tier parking lot. There are three types: flat type (the basic type among self-parking lots, where you move to the upper level by going up a slope of 17% or less), flat step type (a type where you go up one floor at a time), and continuous sloping floor type (a type that spirals up with a gradient of 4% or less. Since the vehicle path also serves as the slope, the area per vehicle is minimized). 【Features】 ○ Types: Flat type, Flat step type, Continuous sloping floor type ○ Floor: Concrete floor, Steel floor ○ Maximum capacity: Approximately 500 vehicles ○ Maximum total floor area: 8,000 m² ● For other functions and details, please download the catalog.
Added to bookmarks
Bookmarks listBookmark has been removed
Bookmarks listYou can't add any more bookmarks
By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.
Free membership registration