1~4 item / All 4 items
Displayed results
Added to bookmarks
Bookmarks listBookmark has been removed
Bookmarks listYou can't add any more bookmarks
By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.
Free membership registrationContact this company
Contact Us OnlineBefore making an inquiry
Download PDF1~4 item / All 4 items
As for our construction achievements at water gates, we have completed the installation of flap gates at Himeji Port, Shikama Port area, repairs of the trash removal machine at the Nishi-Shioiri River drainage pumping station, renovations of the Nakaji agricultural area gate, repairs and maintenance of the coastal conservation facility sluice gate at Sakoshi Fishing Port, improvements to the Kizu diversion gate, renovations of the No. 77 sluice gate on the Chikusa River, renovations of the water supply pipe in the Kohōjō agricultural area, renovations of the Kōike gate in the Jūkoku agricultural area, repairs of the trash removal machine at the Akasaka drainage pumping station, renovations of the Saraike in the Jūkoku Nishi agricultural area, renovations of the water intake adjustment facility at Kuroishi Dam, and renovations of the Fukikashira headworks, among others. For more details, please contact us or refer to our catalog.
Added to bookmarks
Bookmarks listBookmark has been removed
Bookmarks listYou can't add any more bookmarks
By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.
Free membership registrationThe construction contract for piping work (including electrical work) involves repair work on the side wall pipes of the auxiliary boiler on the Arahama side, as well as construction related to the ion exchange resin building. The repair work on the side wall pipes of the auxiliary boiler on the Arahama side includes the removal of the side wall pipes and their insertion using a side wall pipe insertion cart, along with electrical work. The construction related to the ion exchange resin building includes piping painting and other tasks. Notable examples of our achievements include the relocation of the phosphoric acid pump for the IHI wastewater treatment facility and inspections of the auxiliary boiler piping at the Onagawa Nuclear Power Plant. For more details, please contact us or refer to our catalog.
Added to bookmarks
Bookmarks listBookmark has been removed
Bookmarks listYou can't add any more bookmarks
By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.
Free membership registrationThis is an environmentally friendly and clean incinerator that significantly reduces dioxin levels. It also fully complies with pollution regulation standards! Please take advantage of Kumagawa's advanced technology and power, which are future-oriented! Our construction achievements include direct combustion incinerators, dry distillation gasification thermal incinerators, medical waste incinerators, general incinerators, animal incinerators, and experimental furnaces. Our experienced technical staff in environmental projects are responsible for the entire process, and we also carry out repairs, maintenance, and modifications for existing furnaces as well as new installations. Feel free to contact us for catalog requests, estimates, or consultations. For more details, please inquire or check the catalog.
Added to bookmarks
Bookmarks listBookmark has been removed
Bookmarks listYou can't add any more bookmarks
By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.
Free membership registrationThis is an environmentally friendly and clean incinerator that significantly reduces dioxin levels. It also fully complies with pollution regulations! Our experienced technical staff in environmental projects will responsibly handle everything until the end. We not only offer new installations but also repair, maintenance, and modification work for existing furnaces. Please feel free to request a catalog, estimate, or consultation. As of December 2010, our construction achievements include cart-type heat treatment furnaces, annealing furnaces (heating and cooling zones), heavy oil furnaces (lintel and column repair work), maintenance, and replacing refractory materials with bricks (energy-saving change to ceramic fiber), as well as repair work on the brick arch of heating furnaces. For more details, please contact us or refer to the catalog.
Added to bookmarks
Bookmarks listBookmark has been removed
Bookmarks listYou can't add any more bookmarks
By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.
Free membership registration