iPROS Manufacturing
  • Search for products by classification category

    • Electronic Components and Modules
      Electronic Components and Modules
      55891items
    • Machinery Parts
      Machinery Parts
      70743items
    • Manufacturing and processing machinery
      Manufacturing and processing machinery
      95514items
    • Scientific and Physics Equipment
      Scientific and Physics Equipment
      33013items
    • Materials
      Materials
      34849items
    • Measurement and Analysis
      Measurement and Analysis
      52708items
    • Image Processing
      Image Processing
      14548items
    • Control and Electrical Equipment
      Control and Electrical Equipment
      50370items
    • Tools, consumables, and supplies
      Tools, consumables, and supplies
      62938items
    • Design and production support
      Design and production support
      11701items
    • IT/Network
      IT/Network
      40950items
    • Office
      Office
      13068items
    • Business support services
      Business support services
      39946items
    • Seminars and Skill Development
      Seminars and Skill Development
      5816items
    • Pharmaceutical and food related
      Pharmaceutical and food related
      23070items
    • others
      59305items
  • Search for companies by industry

    • Manufacturing and processing contract
      7356
    • others
      5052
    • Industrial Machinery
      4435
    • Machine elements and parts
      3289
    • Other manufacturing
      2871
    • IT/Telecommunications
      2516
    • Trading company/Wholesale
      2454
    • Industrial Electrical Equipment
      2318
    • Building materials, supplies and fixtures
      1821
    • software
      1652
    • Electronic Components and Semiconductors
      1574
    • Resin/Plastic
      1494
    • Service Industry
      1401
    • Testing, Analysis and Measurement
      1132
    • Ferrous/Non-ferrous metals
      980
    • environment
      702
    • Chemical
      631
    • Automobiles and Transportation Equipment
      560
    • Printing Industry
      506
    • Information and Communications
      431
    • Consumer Electronics
      422
    • Energy
      321
    • Rubber products
      311
    • Food Machinery
      305
    • Optical Instruments
      284
    • robot
      269
    • fiber
      250
    • Paper and pulp
      232
    • Electricity, Gas and Water Industry
      173
    • Pharmaceuticals and Biotechnology
      165
    • Warehousing and transport related industries
      145
    • Glass and clay products
      142
    • Food and Beverage
      134
    • CAD/CAM
      121
    • Educational and Research Institutions
      108
    • retail
      106
    • Medical Devices
      99
    • Ceramics
      95
    • wood
      87
    • Transportation
      83
    • Medical and Welfare
      61
    • Petroleum and coal products
      60
    • Shipbuilding and heavy machinery
      53
    • Aviation & Aerospace
      47
    • Fisheries, Agriculture and Forestry
      39
    • self-employed
      23
    • Public interest/special/independent administrative agency
      19
    • equipment
      19
    • Mining
      17
    • Materials
      15
    • Research and development equipment and devices
      14
    • Finance, securities and insurance
      13
    • Government
      13
    • Individual
      10
    • Restaurants and accommodations
      8
    • Police, Fire Department, Self-Defense Forces
      7
    • cosmetics
      7
    • Laboratory Equipment and Consumables
      3
    • Contracted research
      3
    • Raw materials for reagents and chemicals
      2
  • Special Features
  • Ranking

    • Overall Products Ranking
    • Overall Company Ranking
Search for Products
  • Search for products by classification category

  • Electronic Components and Modules
  • Machinery Parts
  • Manufacturing and processing machinery
  • Scientific and Physics Equipment
  • Materials
  • Measurement and Analysis
  • Image Processing
  • Control and Electrical Equipment
  • Tools, consumables, and supplies
  • Design and production support
  • IT/Network
  • Office
  • Business support services
  • Seminars and Skill Development
  • Pharmaceutical and food related
  • others
Search for Companies
  • Search for companies by industry

  • Manufacturing and processing contract
  • others
  • Industrial Machinery
  • Machine elements and parts
  • Other manufacturing
  • IT/Telecommunications
  • Trading company/Wholesale
  • Industrial Electrical Equipment
  • Building materials, supplies and fixtures
  • software
  • Electronic Components and Semiconductors
  • Resin/Plastic
  • Service Industry
  • Testing, Analysis and Measurement
  • Ferrous/Non-ferrous metals
  • environment
  • Chemical
  • Automobiles and Transportation Equipment
  • Printing Industry
  • Information and Communications
  • Consumer Electronics
  • Energy
  • Rubber products
  • Food Machinery
  • Optical Instruments
  • robot
  • fiber
  • Paper and pulp
  • Electricity, Gas and Water Industry
  • Pharmaceuticals and Biotechnology
  • Warehousing and transport related industries
  • Glass and clay products
  • Food and Beverage
  • CAD/CAM
  • Educational and Research Institutions
  • retail
  • Medical Devices
  • Ceramics
  • wood
  • Transportation
  • Medical and Welfare
  • Petroleum and coal products
  • Shipbuilding and heavy machinery
  • Aviation & Aerospace
  • Fisheries, Agriculture and Forestry
  • self-employed
  • Public interest/special/independent administrative agency
  • equipment
  • Mining
  • Materials
  • Research and development equipment and devices
  • Finance, securities and insurance
  • Government
  • Individual
  • Restaurants and accommodations
  • Police, Fire Department, Self-Defense Forces
  • cosmetics
  • Laboratory Equipment and Consumables
  • Contracted research
  • Raw materials for reagents and chemicals
Special Features
Ranking
  • Overall Products Ranking
  • Overall Company Ranking
  • privacy policy
  • terms of service
  • About Us
  • Careers
  • Advertising
  1. Home
  2. Other manufacturing
  3. イーズ 本社
  4. news list
Other manufacturing
  • Added to bookmarks

    Bookmarks list

    Bookmark has been removed

    Bookmarks list

    You can't add any more bookmarks

    By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

    Free membership registration

イーズ 本社

addressTokyo/Minato-ku/3-3-13 Shinbashi, Tsao Hibiya 3F
phone03-6811-2344
  • Official site
last updated:Jan 12, 2021
イーズlogo
  • Contact this company

    Contact Us Online
  • Company information
  • Products/Services(20)
  • catalog(2)
  • news(16)

イーズ List of News Articles

  • category

  • Publication year

  • Publication year : 2021

1~16 item / All 16 items

Displayed results
image_04.png

[Case Study] Introduction of spot bazookas in all rooms of two gymnasiums in Shimotsuma City, Ibaraki Prefecture.

  • Company news

We would like to introduce a case where our product, the "Spot Bazooka," has been implemented at the municipal comprehensive gymnasium and the municipal Chiyokawa gymnasium in Shimotsuma City, Ibaraki Prefecture. This product was successfully implemented due to its significantly lower installation costs compared to conventional air conditioning systems and the opportunity to utilize subsidies related to virus countermeasures. After the installation was completed, during the first summer, we were able to hear the joyful voices of users expressing that it was "cool." 【Case Overview】 ■Challenges - No air conditioning system installed for many years - Enormous installation costs ■Results - Joyful voices from users saying it was "cool"

Dec 27, 2021

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration
image_07.png

[Heat Stroke Prevention Case Study] Meiji Jingu Gaien Tennis Club

  • Product news

This is an introduction to the case of implementing the "Spot Bazooka" at the Meiji Jingu Gaien Tennis Club. Due to the steel frame membrane roof structure, it was difficult to add air conditioning units, and despite various efforts, the indoor temperature would reach nearly 40°C on extremely hot days, leading to ongoing struggles with safety management and labor management. After introducing our product, we have achieved the expected cooling effect, and we have received high praise from our members. On September 23 at 1:00 PM, the outdoor temperature was 32.2°C, while the indoor temperature was 24.8°C, showing a measured drop of about 7°C compared to the outside air. 【Implementation Overview】 ■ Location: Indoor court at Meiji Jingu Gaien Tennis Club  ・Area: 4,531m²  ・Ceiling height: 10.6m ■ Product introduced: Gup Pi Bazooka Single Type, 10 units (rated 4 horsepower, maximum 7 horsepower)

Nov 25, 2021

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration
2021-09-06_11h16_16.png

[Heat Stroke Prevention Case Study] Matsue Elementary School, Kasamatsu Town, Hatorigun, Gifu Prefecture

  • Product news

This is an introduction to the case of introducing "Spot Bazooka" at Matsueda Elementary School in Kasamatsu Town, Hatorigun, Gifu Prefecture. The gymnasiums of two elementary schools in the town still lacked air conditioning, and in light of the incidents of heatstroke among children occurring nationwide, we were considering measures against heatstroke in the gymnasiums. Additionally, with summer classes overlapping due to the COVID-19 pandemic, we decided to implement a solution as soon as possible. As a result, we arrived at the "Spot Bazooka," which was suitable in terms of overwhelming airflow effectiveness, safety, installation space, and cost. After confirming the installation site and conducting a demonstration, we were able to verify its effectiveness, leading to its introduction in both schools. Since the introduction, it has been used not only by the schools but also for community sports activities during school open days, and we have received feedback that activities have become more comfortable. For more details, please refer to the related products and catalog. 【Overview】 ■ Installation Location: Matsueda Elementary School, Kasamatsu Town, Hatorigun, Gifu Prefecture ■ Number of Units Installed: 6 units of Spot Bazooka Single Type ■ Installation Period: May 2020

Sep 06, 2021

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration
2021-09-06_11h07_41.png

[Heat Stroke Prevention Measures Case Study] Vaccination Concentration Venue

  • Product news

This is an introduction to the case of introducing "Spot Bazooka" at the concentrated vaccination site in Ayagawa Town, Kagawa Prefecture. The gymnasium was suddenly designated as a vaccination site, but since air conditioning was not installed, measures against heatstroke and heat were necessary during vaccinations in the summer. Therefore, eight integrated units of the "Spot Bazooka," which require almost no construction, were introduced. They were delivered in June during the rainy season, and during the trial run, a refreshing cool breeze with low humidity was emitted, which seemed to satisfy the town mayor and the townspeople. For more details, please refer to the related products and catalog. 【Overview】 ■ Installation site: Concentrated vaccination site in Ayagawa Town, Kagawa Prefecture ■ Installed product: Eight integrated units of "Spot Bazooka"

Sep 06, 2021

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration
image_10.png

[Heat Stroke Prevention Case Study] Chikushi Jogakuen University

  • Product news

Here is an introduction to the case of Chikushi Jogakuen University, which implemented measures against heatstroke for classes and club activities. Due to the aging of the gymnasium, the university had previously been unable to install conventional air conditioning. However, with the installation of "Spot Bazooka," they were able to conduct physical education classes and club activities without worrying about heatstroke, creating a comfortable environment. Additionally, a safety net was installed as a precaution, ensuring safe use by preventing fingers from getting caught. The drainage of condensate water is managed with a tank. For more details, please refer to the related products and catalog. 【Implementation Overview】 ■ Location: Chikushi Jogakuen University, Fukuoka Prefecture ■ Number of units installed: 4 integrated units ■ Installation period: July 2020

Jun 21, 2021

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration
スクリーンショット 2021-06-21 095729.png

[Heat Stroke Prevention Case Study] Hyogo Prefecture, Pharmaceutical Manufacturing Plant

  • Product news

At a pharmaceutical manufacturing plant in Hyogo Prefecture, during the summer before the introduction of the "Spot Bazooka," the temperature inside the semi-open factory exceeded 35 degrees Celsius, making work very challenging. Therefore, this product was introduced. Since liquids are being handled, the humidity inside the factory was also high, creating a harsh environment with a significant risk of heatstroke. However, after the introduction, workers were able to feel dry, cool air in the work area, and it has received very positive feedback from the employees. For more details, please refer to the related products and catalog. 【Introduction Overview】 ■ Location: Hyogo Prefecture, Pharmaceutical Manufacturing Plant ■ Number of Spot Bazookas Installed - Single Type: 11 units - Twin Type: 2 units - Integrated Type: 1 unit ■ Introduction Period: 2017

Jun 21, 2021

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration
スクリーンショット 2021-06-21 101155.png

[Heat Stroke Prevention Case Study] Kasamatsu Town Matsue Elementary School

  • Product news

We would like to introduce the case of Matsue Elementary School in Kasamatsu Town, which implemented measures against heat stroke for classes and club activities. There are three elementary schools and one junior high school in the town, and air conditioning facilities in classrooms were established early on. However, two of the elementary schools still did not have air conditioning in their gymnasiums. As a result, we arrived at the 'Spot Bazooka,' which was suitable in terms of overwhelming airflow effectiveness, safety, installation space, and cost. After confirming the installation site and conducting a demonstration, we verified its effectiveness and implemented it in both schools. As a result, we have received feedback that not only the school but also local sports activities through school openings are now able to be conducted comfortably. For more details, please refer to the related products and catalog. 【Implementation Overview】 ■ Installation Location: Matsue Elementary School, Kasamatsu Town, Hatori District, Gifu Prefecture ■ Number of Units Installed: 6 Spot Bazooka Single Type ■ Implementation Period: May 2020

Jun 21, 2021

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration
スクリーンショット 2021-06-21 094901.png

[Heat Stroke Prevention Case Study] Sumitomo Heavy Industries Modern Co., Ltd.

  • Product news

At Sumitomo Heavy Industries Modern Co., Ltd., a factory that manufactures large machinery of various sizes and shapes, the indoor environment is air-conditioned, but the height of the building is very high. During the summer, when assembling large machinery, the temperature in high-altitude work areas becomes elevated, necessitating improvements in the working environment. Upon learning that EASE offers a rental of a demo unit for the "Spot Bazooka Integration Set," we consulted with them. We connected a duct to change the blowing direction of the demo unit and confirmed its effectiveness. When we directed the airflow at an upward angle to the high-altitude work area, we confirmed that cold air reached the area, leading us to decide to implement the system. For more details, please refer to the related products and catalog. [Implementation Overview] ■ Installation Site: Sumitomo Heavy Industries Modern Co., Ltd. (Futtsu City, Chiba Prefecture) ■ Installed Products: Four units of the "Spot Bazooka Integration Set" (350mm reducer + flexible duct)

Jun 21, 2021

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration
スクリーンショット 2021-06-21 103728.png

[Heat Stroke Prevention Case Study] Hanwa Co., Ltd.

  • Product news

At the factory of Sanko Kogyo Co., Ltd., we have been working on heat countermeasures through the installation of fans, provision of cooling vests, and taking breaks during work when the WBGT warning temperature is reached. However, in order to further improve the workplace environment and ensure the safety of our workers, we have decided to implement more advanced measures across all sites. We are introducing our highly efficient air conditioning units at our locations nationwide. In selecting the air conditioning units, the 'Spot Bazooka,' which can blow cool air approximately 20 meters even in semi-open buildings, emerged as a strong candidate. This decision was made based on performance verification through demonstration units and confirmation of implementation results in the market. For more details, please refer to the related products and catalog. 【Implementation Overview】 ■ A total of 99 Spot Bazookas have been installed at 20 locations nationwide (18 sales offices, including group companies, and 2 factories) as of the end of 2020.  * Breakdown: 15 integrated units and 84 separate units (single type).

Jun 21, 2021

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration
スクリーンショット 2021-06-21 103040.png

[Heat Stroke Prevention Case Study] Vehicle Maintenance Facility

  • Product news

This is an introduction to a case study implemented at a vehicle maintenance facility. The work inside the vehicle maintenance facility was being conducted without air conditioning, but due to the ongoing extreme heat during the summer years, we were considering measures against heatstroke. As a solution, we installed one spot bazooka unit in each vehicle maintenance lane, which is the main work flow, and also installed two additional spot bazooka units on the opposite side. We considered various products, but after experiencing the actual machine at an exhibition, we decided on the Ease spot bazooka. The deciding factor was its high air volume, which allowed the air conditioning's cooling air to reach far, and after installation, the dehumidified dry air helped to dry sweat, creating a comfortable environment. For more details, please refer to the related products and catalog. 【Implementation Overview】 ■ Installation Location: Koto Ward, Tokyo, Vehicle Maintenance Facility ■ Number of Units Installed: 7 Spot Bazooka Units ■ Installation Period: July 2020

Jun 21, 2021

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration
スクリーンショット 2021-06-21 102859.png

[Heat Stroke Prevention Case Study] Shinkokugyo Co., Ltd.

  • Product news

Shinchu Kogyo has been considering measures against heatstroke at their automobile maintenance facility for some time. During their consideration of air conditioning systems due to their headquarters relocation, they learned about the existence of the Spot Bazooka at an exhibition. The Spot Bazooka blows cool air specifically at the work area (only where needed), which significantly reduces initial costs compared to installing a conventional air conditioning system. Furthermore, due to the nature of the maintenance facility, dust is a concern. The Spot Bazooka's environmental durability, allowing for outdoor use while being easy to maintain, was a key factor in its adoption. For more details, please refer to the related products and catalog. [After Implementation] ■ Significantly reduced initial costs ■ Environmental durability for outdoor use ■ Easy maintenance ■ The cooling air reached over 10 meters even in the semi-open maintenance facility where outside air enters, allowing workers to perform maintenance comfortably ■ Increased work efficiency

Jun 21, 2021

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration
スクリーンショット 2021-06-21 102714.png

[Heat Stroke Prevention Case Study] 19 Public Elementary and Junior High School Gymnasiums in Nakano Ward, Tokyo

  • Product news

In Nakano Ward, we have introduced spot bazookas, focusing on the elementary and junior high schools that are planned for renovation in the future. Although there are plans for future renovations, we have implemented the introduction with a budget constraint of three units per school, and the schools that have actually used them have expressed their satisfaction, saying, "It's very cool." Since it is a lease introduction, the spot bazookas have a short installation period from planning to setup (possible within a year), and the representatives from Nakano Ward have also evaluated it positively, stating, "It was good that we could install it quickly." Additionally, the indoor and outdoor units are compact, making relocation easy. In Nakano Ward, they plan to relocate the equipment before the start of renovation work at the elementary and junior high schools to make effective use of the leased equipment. For more details, please refer to the related products and catalog. 【Introduction Overview】 ■ Nakano Ward Saginomiya Elementary School Gymnasium Indoor Unit ■ Nakano Ward Saginomiya Elementary School Gymnasium Outdoor Unit ■ Nakano Ward Eighth Junior High School Gymnasium Indoor Unit ■ Nakano Ward Eighth Junior High School Gymnasium Outdoor Unit

Jun 21, 2021

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration
スクリーンショット 2021-06-21 102500.png

[Heat Stroke Prevention Case Study] Koshigaya Chemical Industry Co., Ltd.

  • Product news

Koshigaya Kasei Kogyo Co., Ltd. has been struggling with heatstroke measures for employees every year as the temperature inside the factory exceeds 35 degrees in summer. However, we found the powerful spot air conditioner "Spot Bazooka" on the website. Immediately (in mid-July 2018), we borrowed a demo unit for one week and tested it in the extreme heat of the factory. The cool, dry air reached far and was very well received by the employees, leading us to decide to implement it. By attaching a flexible duct of the same size as the indoor unit's blower, we reduced duct resistance, allowing a large volume of cool air to be supplied throughout the factory, and the direction of the airflow could be easily changed. For more details, please refer to the related products and catalog. 【Implementation Overview】 ■Challenges - The temperature inside the factory exceeds 35 degrees in summer, and we have been struggling with heatstroke measures for employees every year. ■Effects - The cool, dry air reached far and was very well received by the employees.

Jun 21, 2021

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration
スクリーンショット 2021-06-21 102258.png

[Heat Stroke Prevention Case Study] Bunkyo Gakuin University Girls' Junior and Senior High School

  • Product news

Among the three gymnasiums in total, the main gymnasium of the academic building, which did not have air conditioning installed, had previously considered introducing air conditioning. However, due to the excessively high costs, the introduction plan was put on hold. Upon learning about our products, they decided to reconsider the installation. In the case of the "Spot Bazooka," it was found that it could be installed for less than one-fifth of the cost of conventional equipment, leading to the decision to proceed with the installation. As a result, during the summer before installation, the temperature inside the gymnasium exceeded 30 degrees Celsius, making classes and club activities difficult due to the heat. However, after the installation, it became very cool and comfortable. For more details, please refer to the related products and catalog. [Case Summary] ■ Installed Equipment: Guppy Bazooka Single Type, 4 units ■ Capacity: Maximum 7 horsepower (28 horsepower for 4 units) ■ External Dimensions and Weight - Indoor Unit: Height 920 x Width 950 x Depth 330 mm, 52 kg - Outdoor Unit: Height 1350 x Width 950 x Depth 330 mm, 90 kg

Jun 21, 2021

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration
スクリーンショット 2021-06-21 102024.png

[Heat Stroke Prevention Case Study] Home Logistics Co., Ltd.

  • Product news

The warehouse of Home Logistics Co., Ltd. has a floor height of just under 10 meters, and cooling the entire building would incur tremendous costs. However, if left unattended, the environment can exceed 35°C in the peak summer, posing a constant risk of heatstroke. Therefore, we introduced the air conditioner 'Guppy Bazooka,' which is used in agricultural greenhouses. It delivers powerful cold air up to 50 meters away with its high airflow and static pressure (the force that pushes air). We first tried one unit, and it indeed delivered cold air up to 50 meters. Next, we purchased four more units, and the workers rated it as "excellent." As a result, approximately 117 units were installed in seven regional distribution centers (logistics warehouses) of Home Logistics. For more details, please refer to the related products and catalog. [Implementation Overview] ■ Issues - Cooling the entire warehouse would incur tremendous costs. - The environment can exceed 35°C in the peak summer if left unattended. ■ Effects - Powerful cold air reaches up to 50 meters away with high airflow and static pressure (the force that pushes air). - There are no vinyl ducts, so it does not interfere with work.

Jun 21, 2021

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration
スクリーンショット 2021-06-21 101713.png

[Heat Stroke Prevention Case Study] Saitama Prefectural Disaster Prevention Aviation Center

  • Product news

This is an introduction to the case study implemented at the Saitama Prefectural Disaster Prevention Aviation Center. The Saitama Prefectural Disaster Prevention Aviation Team conducts aerial firefighting and rescue operations using helicopters. This time, we introduced the "Spot Bazooka" as a measure against heatstroke during the team's intense training sessions. Until now, training inside the helicopter hangar was conducted in a very harsh environment due to the lack of air conditioning, but after the introduction, the team members have been able to operate comfortably and efficiently, receiving great praise from the members. For more details, please refer to the related products and catalog. [Overview] ■ Issues - Training inside the helicopter hangar was conducted in a very harsh environment due to the lack of air conditioning. ■ Effects - After the introduction, team members have been able to operate comfortably and efficiently, receiving great praise.

Jun 21, 2021

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration
Prev 1 Next
  • イプロスがリアル展示会を主催します! AI/DX 営業・マーケティング展 出展社募集中 リード数・商談数が止まらない!新しいリアル展示会を提供 会期 2026年3月24日(火)~25日(水) 会場 東京ビッグサイト東4ホール 出展概要資料を進呈!
  • ケーブルマーキングや銘板などに! 耐水性 耐薬性 耐熱性 耐擦過性 ブラザー独自構造のラミネートラベル 実物ラベル サンプルプレゼント!
    • Contact this company

      Contact Us Online

    Products

    • Search for Products

    Company

    • Search for Companies

    Special Features

    • Special Features

    Ranking

    • Overall Products Ranking
    • Overall Company Ranking

    support

    • site map
    IPROS
    • privacy policy Regarding external transmission of information
    • terms of service
    • About Us
    • Careers
    • Advertising
    COPYRIGHT © 2001-2025 IPROS CORPORATION ALL RIGHTS RESERVED.
    Please note that the English text on this page is automatically translated and may contain inaccuracies.