1~2 item / All 2 items
Displayed results
Added to bookmarks
Bookmarks listBookmark has been removed
Bookmarks listYou can't add any more bookmarks
By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.
Free membership registrationContact this company
Contact Us OnlineBefore making an inquiry
Download PDF1~2 item / All 2 items
Michinas Co., Ltd. specializes in the design of "elevating devices, special machinery, barrier-free equipment, etc." We also handle the development design of "elevating devices (passenger elevators)" with power-driven mechanisms and "residential equipment." In addition, for "special machinery," we have received multiple orders for product design related to aerospace equipment and for major comprehensive machinery manufacturers. 【Achievements (partial)】 ■ Lifters and transport equipment ■ Special machinery ■ Consumer product development ■ Development design of residential equipment ■ Control panel and control system design for thermal power generation and water treatment plants, etc. *For more details, please refer to the PDF materials or feel free to contact us.
Added to bookmarks
Bookmarks listBookmark has been removed
Bookmarks listYou can't add any more bookmarks
By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.
Free membership registrationOur company is engaged in the development and manufacturing of a device called the "Cleanliness Assurance Inspection Device," which is designed for the cleaning of aircraft jet engine parts and the final inspection to ensure that no micron-sized debris remains. The system is designed as a piping and exhaust line that allows for the repeated use of the cleaning solution (Bartrell), enabling the removal and treatment of debris and moisture from the wastewater through filtration for repeated use. Additionally, we provide thorough support for after-sales services, including maintenance, even after delivery, so please feel free to contact us if you have any requests. 【Details】 ■ Software used: Solid Works ■ Duration: 5 months (from order to installation) ■ Number of personnel involved: 2 (design department) *For more details, please feel free to contact us.
Added to bookmarks
Bookmarks listBookmark has been removed
Bookmarks listYou can't add any more bookmarks
By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.
Free membership registration