[New Construction Case Study] Adjustment Pond Dredging Work

We have uploaded a new construction case using the high water content soil stabilizer MT series. This case involves the dredging work of a retention pond located in a residential area. Please take a look at the link below.
This project involves the removal of mud and soil that has accumulated in the retention pond.
The site is located near a residential area, and due to the limited construction space, it was difficult to use cement or lime for stabilization.
Therefore, the high water content soil stabilizer MT-1 was adopted, and after stabilization with this product, the material was immediately transported by dump truck to a nearby temporary storage area.
*For more details, please refer to the PDF document or feel free to contact us.


Inquiry about this news
Contact Us Online