[Case Study Presentation] Introduction of ACAD-DENKI by Aim Manufacturing! We will reveal the secrets behind achieving "DX implementation" in sync with the field. 3

■Do you have any of the following concerns?
- You are progressing with DX preparations but feel a disconnect with the on-site team.
- You are not effectively utilizing drawing data.
- The workload in the manufacturing site is increasing, and there is a shortage of manpower.
In the control panel manufacturing sector, improving work efficiency due to a serious labor shortage has become a challenge, and like other manufacturing industries, there is an urgent need to respond to DX. However, many companies may still cling to traditional methods and struggle to prepare for DX.
This case study contains information that may be helpful for such companies. Please feel free to download it.

Inquiry about this news
Contact Us OnlineMore Details & Registration
Details & Registration
Related Documents
Related Links
Request materials for "ACAD-DENKI" introduced by Aimu Seisakusho here
Related product
Related catalog(7)
