【Example of ZEROSAI Implementation】 Regional Development Bureau - River Embankment Protection Work Manage water levels in three stages to prepare for sudden rises in water levels!
We will introduce a case study of the disaster prevention system ZEROSAI (NETIS registration number QS-150021-VE). It can be utilized not only for safety measures but also for creative ideas and technical proposals.
Challenges on-site: Key points in evaluation
[Operational Environment]
- Install the [N Sensor] near the site to view wind speed predictions and observation data on the cloud. Since there is no power supply at the site, a solar power system will be installed.
- Install a [battery-operated water level gauge] in the nearby river to monitor water levels.
[Purpose of Implementation]
- There is a dam upstream, and when sudden torrential rain occurs, the water level rises rapidly, necessitating quick evacuation.
- Due to frequent crane operations, project management must ensure that work is conducted on days when wind speed predictions do not exceed the operational halt threshold of 10 m/s.
- Information sharing regarding work stoppages or changes in the schedule must be conducted swiftly.
■ Proposal (Example)
For more details, please download the PDF.

Inquiry about this news
Contact Us OnlineMore Details & Registration
Details & Registration
Related Links
Related product
Related catalog(11)





