[HOTJEBLO Fujiyama R2 Case] Water damage restoration cleaning under the floors of middle school classrooms and gymnasiums.

The manpower required for the restoration cleaning two years ago was less than 1/6, and the construction period was also less than 1/3! Introduction of a method suitable for underfloor cleaning.
After the heavy rain disaster in 2020, we received an inquiry from the Board of Education of a certain city in Kyushu regarding the restoration cleaning of the underfloor of a middle school classroom and gymnasium that were flooded due to the overflow of a river flowing next to the school.
Due to the narrow working space, large equipment could not be brought in, and it required considerable effort to scoop out the accumulated sludge. They were troubled by the difficulty of needing manpower during times of flooding.
Therefore, we introduced the "HOTJEBLO Fujiyama R2." The non-splashing high-pressure cleaning and simultaneous suction of wastewater proved to be a method suitable for underfloor cleaning, allowing us to achieve results with less than 1/6 of the manpower and less than 1/3 of the construction period compared to the restoration cleaning during the previous year's flooding.
[Case Overview]
■ Equipment Introduced: HOTJEBLO Fujiyama R2
■ Problems
- Large equipment could not be brought in due to the narrow working space.
- Difficulties during times of flooding when manpower is needed.
*For more details, please refer to the PDF document or feel free to contact us.

Inquiry about this news
Contact Us OnlineMore Details & Registration
Details & Registration
Related Links
Introduction and overview of the HOTJEBLO Fujiyama R2 product.
YouTube related video link