The design takes maintenance into consideration, allowing for easy replacement of the filter element without the need to remove other equipment or piping tubes.
We are also open to discussing delivery methods. The design takes maintenance into consideration, allowing for easy replacement of the filter element without removing other equipment or piping tubes. Depending on the size of the panel, the estimated time from design to delivery is about 2 weeks to 1 month.
Inquire About This Product
basic information
【Features】 ○ Designed with maintenance in mind ○ The cleaning of the valve surface can be easily performed without removing the tube ○ Depending on the size of the panel, the estimated time from design to delivery is approximately 2 weeks to 1 month ● For more details, please contact us or refer to the catalog.
Price information
Please feel free to contact us.
Delivery Time
※Please feel free to contact us.
Applications/Examples of results
Please contact us for inquiries about applications and examples of achievements.
Company information
Our company has 20 years of experience in the design and manufacturing of air panels. We continue to produce products that satisfy a wide range of customers, from large publicly listed corporations to small individually owned businesses. Although we are a small company, we are confident in our quality and track record.