We have a range of models suitable for horizontal boring work and drainage well construction in suppression works, as well as for pile work, anchor work, and shaft work.
In the boring machines used for landslide prevention construction, we offer 8 products: "TOP (horizontal boring)", "SD (horizontal boring)", "HDS", "TNS" for suppression works, and "LS", "TBM", "HLL", "LFM", "HDS", "TNS" for deterrent works. Please choose these machines according to the applicable purpose. Detailed information and materials are available on our website (http://www.toa-tone.jp/).
Inquire About This Product
basic information
≪TOP≫ It is a mechanism specialized for horizontal boring, featuring a double-tube structure. Model: TOP-LS21, TOP-MM, TOP-SS ≪SD≫ It can perform short-distance horizontal boring at high speed up to about 100m. Model: SDH-100 ≪HDS≫ A rotary percussion type excavator that is effective for short-distance excavation up to about 100m. Model: HDS-S, HDS-M ≪TNS≫ A rotary percussion type excavator that enhances the performance of the HDS. Model: TNS-15 ≪LS≫ A dedicated machine for anchor holes on slopes, designed to be ultra-lightweight for transport and movement. Model: LS-15 ≪LFM≫ An electric top drive type excavator with a drilling depth of up to about 600m. Model: LFM-700, LFM-1500 ≪TBM≫ A spindle type medium-sized high-performance drill with a drilling depth of up to about 150m. Model: TBM-88 ≪HLL≫ An excavator that enables construction with large diameter and deep depth, with a drilling depth of up to about 1000m. Model: HLL-Super
Price information
Please feel free to contact us.
Delivery Time
※Please feel free to contact us.
Applications/Examples of results
≪TOP≫ Landslide prevention works, construction project investigation ≪SD≫ Landslide prevention works ≪HDS≫ Landslide prevention works, landslide control works ≪TNS≫ Landslide prevention works, landslide control works ≪LS≫ Landslide control works ≪LFM≫ Landslide control works, groundwater development ≪TBM≫ Landslide prevention works, groundwater development, mineral resource development, academic research, cast-in-place pile construction ≪HLL≫ Landslide control works, groundwater development
catalog(2)
Download All CatalogsCompany information
As we aim to achieve the Sustainable Development Goals (SDGs) by 2030, we have entered an era that demands a shift in thinking amidst rapid changes. While focusing on cultivating talent with new perspectives to move towards a sustainable future, we believe it is our mission to also create a company that offers surprises and attractions for our customers. Furthermore, as a member of the Toa Road Group, we will continue to leverage our strengths in speedy business development and diverse industries, challenging ourselves to move from "continuous creation" to "new value creation." In all our business operations, we prioritize safety and security, and we are committed to building a sustainable company that can deliver trust to people around the world, always pouring our passion into our efforts.