Apply a voltage between the platinum electrodes and drip the electrolyte until tracking failure occurs. Evaluate at a voltage that does not cause failure with the specified number of drips.
Apply voltage between platinum electrodes and drip the electrolyte until tracking failure occurs. Evaluate at a voltage that does not cause failure with the specified number of drops. - IEC60112 CTI (Comparative Tracking Index: Determine the voltage that withstands 50 drops) PTI (Proof Tracking Index: Prove that it withstands 50 drops at the specified voltage)
Inquire About This Product
basic information
【Features】 ○ IEC60112 ○ CTI (Comparative Tracking Index - voltage withstand for 50 drops) ○ PTI (Proof Tracking Index - proof of withstanding 50 drops at specified voltage) ● For other functions and details, please contact us.
Price information
Please feel free to contact us.
Delivery Time
※Please feel free to contact us.
Applications/Examples of results
For more details, please contact us.
catalog(1)
Download All CatalogsCompany information
At DJK, we respond to all customer needs swiftly and accurately under confidentiality. DJK engages in the following activities related to polymer materials and composite materials: 1. Synthesis, polymerization, and modification reactions 2. Compounding, molding, and sample processing 3. Material testing, physical property measurement, and analysis services 4. Technical consulting 5. Defective product failure analysis testing 6. Application and testing outsourcing for overseas standards (FDA/EPA, DMF, biodegradability certification, and others)