Keep the circulating water in the cooling tower clear, significantly reducing chemical and maintenance costs!
This is a case study of the magnetic water treatment device "Muzou" from Toko Co., Ltd. By introducing the magnetic water treatment device, we were able to stop the use of scale prevention agents, resulting in savings of 500,000 to 600,000 yen per year in chemical costs. Additionally, the maintenance work for cooling pipes, which was conducted 2 to 3 times a year, became unnecessary, leading to a reduction in labor costs of about 100,000 yen per year. An unexpected benefit was that scale no longer adhered to the ammonia transport pipes, improving thermal conductivity and significantly reducing energy costs. For more details, please contact us or download the catalog.
Inquire About This Product
basic information
**Features** - Stopped the addition of scale inhibitors → Savings of 500,000 to 600,000 yen/year on chemical costs - Maintenance work on cooling pipes, which was done 2 to 3 times a year, is no longer needed → Reduction of labor costs by approximately 100,000 yen/year - No scale adhesion around the ammonia condensate transport pipes → Improved thermal conductivity, drastically reduced energy costs → Savings of approximately 200,000 to 250,000 yen/year **Case Studies** - Issue: Decreased heat exchange rate → Cause: Scale accumulation around the cooling pipes → After implementation: Scale detachment from the pipes - Issue: Low water spray volume → Cause: Scale accumulation inside the pipes, clogging the spray nozzles → After implementation: Scale detachment from the center of the support, increased water volume - Issue: Low cooling water spray volume leading to reduced cooling effect → Cause: Scale accumulation inside the pipes, clogging the spray nozzles → After implementation: Significant improvement in cooling water spray volume - Issue: Adhesion of algae, scale, and slime → Cause: Increased contamination of cooling water → After implementation: Scale detachment from the vicinity of the make-up water Detachment of algae and slime from the circulating water pipes ● For more details, please contact us or download the catalog.
Price information
Please contact us.
Delivery Time
※Please contact us.
Applications/Examples of results
For more details, please contact us or download the catalog.
catalog(1)
Download All CatalogsNews about this product(1)
Company information
■Location 2-2 Tobihata-machi, Tobata-ku, Kitakyushu City, Fukuoka Prefecture, Tobihata Building 3F ■Established 1990 ■Registered Company Nippon Steel Corporation ■Nomination Registration Fukuoka Prefecture, Fukuoka City, Kitakyushu City ■Affiliated Organizations Kitakyushu Chamber of Commerce and Industry, Fukuoka Prefecture and Fukuoka Condominium Management Association Federation