This is an introduction to gas holder purge and burner installation work.
Comprehensive Non-Destructive Testing Co., Ltd. is a company that "sees the unseen." This is an introduction regarding construction work. Gas holder purge Burner installation Deodorizer installation Temporary piping installation for purging Valve attachment and detachment Valve maintenance And many other construction works. For more details, please contact us.
Inquire About This Product
basic information
【Construction】 Gas holder purge Burner installation Deodorizer installation Temporary piping installation for purge Valve removal and installation Valve maintenance 【Qualified Personnel】 (Japan Non-Destructive Testing Association) Magnetic particle testing: Level 3: 1 person, Level 2: 31 persons Ultrasonic testing: Level 3: 5 persons, Level 2: 25 persons Radiographic testing: Level 3: 2 persons, Level 2: 18 persons Penetrant testing: Level 3: 2 persons, Level 2: 29 persons Eddy current testing: Level 2: 6 persons Strain measurement: Level 2: 6 persons (Japan Welding Engineering Society) WES-8103 Welding Management Engineer: 18 persons WES-8701 CIW Non-Destructive Testing Engineer: 9 persons (Japan Steel Structure Association) Architectural steel structure ultrasonic testing engineer: 6 persons Architectural steel product inspection engineer: 5 persons Many qualified personnel are available. ◎ For more details, please contact us.
Price information
Please contact us.
Delivery Time
Applications/Examples of results
Please contact us.
catalog(1)
Download All CatalogsCompany information

![[Case Study] Installation of a Smoking Area in a Tempura Restaurant Utilizing Existing Exhaust Pathways / Tokyo](https://image.mono.ipros.com/public/product/image/87d/2001508538/IPROS11172954739239592148.jpg?w=280&h=280)

![Air conditioning equipment installation work and electrical equipment work [Many public construction project achievements!]](https://image.mono.ipros.com/public/product/image/3ac/2000630803/IPROS18426078626118831956.jpeg?w=280&h=280)
