Production period is 2 to 4 weeks! We will process the back according to your needs.
We offer back processing of polyurethane belts. Various processing options are available to meet special applications, including heat resistance, abrasion resistance, wear resistance, acid resistance, high flexibility, FDA approval, attachments, and special joints (patented). The production period is 2 to 4 weeks. For more details, please contact us. 【Features】 ■ Various processing options available for special applications ■ Heat resistance, abrasion resistance, wear resistance, acid resistance ■ High flexibility ■ FDA approved ■ Reduced noise during high-speed operation (tooth surface processing) *For more details, please refer to the PDF document or feel free to contact us.
Inquire About This Product
basic information
For more details, please refer to the PDF document or feel free to contact us.
Price information
We will provide a quote. Please feel free to contact us.
Delivery Time
※Production period: 2 to 4 weeks, transportation period: 1 to 2 weeks.
Applications/Examples of results
[Applications] ■ Paper industry, woodworking industry, glass industry, ceramics industry, printing industry, packaging industry, glass manufacturing, printing equipment, packaging printing devices, equipment for transporting light and fragile items, vacuum transport, etc. *For more details, please refer to the PDF materials or feel free to contact us.*
catalog(1)
Download All CatalogsCompany information
1. Continental Contitech (formerly Goodyear) distributor 2. Sales of Granutech-Saturn shredders from North American SSI 3. General agent for Benri Door Robo automatic door installation 4. Contract processing of metal parts and integrated assembly work 5. Sales of various types of tires (import and export) 6. Sales of imported exteriors