[Catalog sample distribution available] Sales of vacuum standard parts have started! Smooth support and technical consultation made possible by a vacuum manufacturer!
We have started selling components for vacuum devices. We deliver various parts that comply with JIS standards, ISO-KF/LF standards, and ICF standards in a short lead time. Additionally, we can accommodate custom orders as well as standard products. Our vacuum technology staff is available to assist, so please feel free to consult us about anything beyond the products for sale. 【Main Products】 - Flanges Blank flanges Welded flanges Rotating flanges - Fittings Same shape I-type fittings (standard) Same shape L-type fittings (standard) Same shape T-type fittings (standard) Same shape X-type fittings (standard) Same shape conversion fittings (standard) Different shape conversion fittings Different shape introduction conversion fittings (standard) Zero-length conversion fittings Flexible fittings Low-temperature refrigerant introduction flanges Ultra-low temperature refrigerant introduction flanges - Introduction terminals and more 【For more details, please download the catalog or feel free to contact us】
Inquire About This Product
basic information
【Exhibition Participation Information】 ◆Industrial Exchange Exhibition 2012 Venue: Tokyo Big Sight Date: November 20 (Tuesday) - 22 (Thursday), 2012 ◆Technical Show Yokohama 2013 Venue: Pacifico Yokohama Date: February 6 (Wednesday) - 8 (Friday), 2013 【For more details, please download the catalog or feel free to contact us】
Price information
Please feel free to contact us.
Delivery Time
※Please feel free to contact us.
Applications/Examples of results
Parts for various vacuum devices
catalog(2)
Download All CatalogsCompany information
Through the assembly work of various vacuum devices such as sputtering, deposition, organic EL, solar cells, metalizing, CVD, and freeze-drying, there are many skilled workers with extensive knowledge and experience related to vacuum technology. Gas piping is manufactured in a clean welding room installed within the clean room. In addition to the on-site installation of secondary connection piping at the installation site, we also undertake the construction of ladder installations for electrical wiring.