- Kumamoto Regional Joint Government Building A and B - OA Floor Construction Photo Collection
A collection of construction photos of the low-floor OA floor "Network Floor 40," which has been continuously adopted for newly built large government office projects.
【Selected Points】 Following the completion of Building A in 2010, the "network floor" was selected for Building B in 2014. 1. Strong demand from tenant agencies There was a request for continued adoption from those who had actually used the network floor implemented in Building A and confirmed its product performance. 2. Ease of wiring Tenant agencies often perform wiring changes themselves and strongly desired an OA floor (free access floor) that allows them to easily manage and change wiring. Additionally, with 44 wiring outlets per square meter, they can freely access wiring from any desired location. 3. Proven track record and certification/evaluation from public institutions There is a reassuring track record of over 14 million square meters and a 10-year warranty. Furthermore, it is recognized as a "quality performance evaluation product" by the Public Building Association. Moreover, it is made of ultra-high-strength lightweight concrete, which provides excellent durability and does not develop wobbling over the years, eliminating maintenance costs. Additionally, with a height of 40mm, it complies with barrier-free laws and is an environmentally friendly OA floor that can be reused and recycled. *You can view the actual construction details in the catalog.
Inquire About This Product
basic information
◎ Construction Status of Buildings A and B ● Location: 2-10-1 Kasuga, Nishi Ward, Kumamoto City, Kumamoto Government Building ● OA Floor Used: Network Floor 40 【Building A】 - Construction Area: 10,665 m² - Construction Period: 2010/7/20 to 8/28 (Total of 40 days) 【Building B】 - Construction Area: 9,106 m² - Construction Period: 2014/6/2 to 8/15 (Total of 51 days) *We are pleased to present actual construction photos from before the construction (overall view) to the completion of the tile carpet installation! Please take this opportunity to have a look.*
Price range
Delivery Time
Applications/Examples of results
For more details, please refer to the catalog. We will introduce actual photos from before construction (overview) to the construction process of the OA floor and the completion of the finishing material (tile carpet).
Company information
Kyoei Kaitech is committed to developing and providing comfortable products for people, society, and the Earth through our unique technology. The advanced power distribution system "Bus Duct," which has significantly changed the concept of wiring as an alternative to cables. The best-selling "Network Floor" that supports a highly information-oriented society. Aiming for a green Earth that is friendly to people, the wall greening and rooftop greening system "Square Turf." With these products, we are actively working on building an information-oriented society and preserving the global environment. Additionally, as a manufacturer with the know-how, technical skills, and power to respond quickly to user requests, we have received high praise.