Carport frame (for parking lot use)
Solar power generation mounting frame
We will provide a parking lot rack (for solar power generation, made of aluminum).
You can effectively utilize the space of a large parking lot.
Inquire About This Product
basic information
*Product Description Material: Aluminum AL6005-T5, SS-400 Surface Treatment: Anodizing, Hot-Dip Galvanizing Maximum Wind Speed: 60m/s Snow Load: 1.5KN/M2 *Features Quality Guarantee: 10 years of quality assurance. The product set is packaged in a wooden box. We can install the frame as per the customer's request. It allows for effective use of a large parking space.
Price range
Delivery Time
P4
※The delivery time may vary depending on the quantity, so please feel free to contact us.
Applications/Examples of results
Carport installation frame
Company information
Hugh Energy aims to become a world-leading supplier and manufacturer of mounting systems by providing mounting structures and solar power-related products and services for public works, commercial, industrial, and residential projects. We are dedicated to the development of technological innovations and wish to support the continuously increasing global demand for solar energy in the future. Safe and reliable products - Component development and mounting proposals are based on the latest JISC8955 standards. - Structural calculation reports meet the strict standards set by the Ministry of Economy, Trade and Industry. Wide range of product lineup - We handle a wide range of products, from industrial mounting systems to roof specifications, parking lot mounts, agricultural types, tracking systems, and solutions for snowy and sloped areas. Quick response - For projects under 5MW, we can ship within 15 days of order and deliver to the site in as little as 30 days (basic port). - We have a subsidiary in Japan, allowing us to quickly respond to unexpected situations at construction sites and urgent projects. Comprehensive service - Direct delivery to the site (DDP) enhances convenience: we handle customs clearance, full taxation, land transportation, and delivery to the site at the Japanese port, increasing overall convenience.