Experience realism in simulation training! A cart developed for medical training institutions.
The training emergency cart is a cart developed for medical training institutions. It can be equipped with a drip stand and a cylinder mounting platform. It also offers excellent cost performance. The drip stand, cylinder mounting platform, and internal partition boards for the drawers are optional. Additionally, as a separate option, drawers and shelves are available for the lower space. 【Features】 - A cart developed for medical training institutions - Can be equipped with a drip stand and a cylinder mounting platform - Excellent cost performance For more details, please contact us or download the catalog.
Inquire About This Product
basic information
【Features】 ○ A cart developed for medical training institutions ○ Can also accommodate a drip stand and gas cylinder mounting platform ○ Excellent cost performance ○ Options → Drip stand, gas cylinder mounting platform, drawer dividers → Additional options: drawers for the lower space, shelves 【Specifications】 ○ Size: W65×H105×D44.5 ● For more details, please contact us or download the catalog.
Price information
Please contact us.
Delivery Time
※Please contact us.
Applications/Examples of results
For more details, please contact us or download the catalog.
catalog(1)
Download All CatalogsCompany information
Machining and metal processing are now facing competition from overseas. Despite this challenging situation, there are several reasons why Inoue Manufacturing is steadily on the path to growth. One reason is the quality that meets our customers' needs. The metal parts processed using the know-how and technical skills we have cultivated over many years are well-regarded, and we receive high satisfaction from our customers. Furthermore, thanks to this reliable technical capability, unnecessary work does not occur during the manufacturing process, allowing us not only to meet the desired delivery dates but also to reduce costs. Another point to mention is the labor innovation that Inoue Manufacturing is engaged in. We are conducting "on-site improvement activities" under the guidance of Nissan Motor's NPW Improvement Consulting Office. This initiative has enabled us to effectively utilize resources such as personnel and equipment, and we have established a system to implement the PDCA cycle to further develop these improvements. This has allowed us to spend time on new customer development and the creation of original molded products. Everything is for our customers. Our challenges will continue.