If you wear the air cooling vest, you can get cool air from the compressor.
Cooling principle: Spin chamber (vortex tube temperature and cold air separation tube) method
Inquire About This Product
basic information
- Input: Compressed air from a compressor (2KW, 0.6m³/min or more) - Air consumption: 0.2m³/min - Cooling amount: 20℃ - Total equipment weight: 500g - Cool air vest material: Flame-retardant polyester netting, navy blue - Two-way cool air delivery pipe: φ10mm transparent PVC pipe (cool air unit) - Temperature adjustment vortex tube: Nylon white (uncolored) 118*39*35mm, 70g - Oil-water separator: Polycarbonate transparent φ40*100mm, 70g, pressure adjustment range 0.5-9kgf/cm² - Airflow adjustment lever: Inner diameter 12.7mm DN8 copper alloy, 30*90mm, 80g
Price information
9800 yen
Price range
P1
Delivery Time
P3
Applications/Examples of results
(Main use) For fixed position work in factories, welding workers, press workers, etc.
Detailed information
-
Detail 1: Principle of the Spin Chamber Vortex Tube
-
Detail 2, blade tip cooling
-
Detail 3, Spin Chamber
-
Detail 4: Cold Air Unit
-
Section 5, Cold Air Unit
-
3, Air Cooling Vest
-
4, Air Cooling Vest
-
5, Air Cooling Vest
-
6, Air Cooling Vest
Company information

アソシエイト トレーディング 土屋 裕 v09018951120 qq3508274141 ttt@zd.wakwak.com
Associate Trading Co., Ltd. will produce products based on the following policies: 1. As a trading company, we generally do not hold product inventory. 2. The transaction conditions are: advanced payment and, depending on the item, a lead time of approximately 40 days for made-to-order production. 3. Once the order is confirmed, we will issue an order confirmation. 4. Deliveries will be made in installments whenever possible, allowing users to see and try the products themselves while confirming the quality during delivery. 5. Therefore, we ask users to set delivery dates that allow for as much flexibility as possible for partial deliveries. 6. For users with ongoing transactions, we generally ask for your understanding regarding lead time stabilization through procurement from multiple companies. 7. In the unlikely event that issues arise with quality, lead time, cost, or transportation, we can respond flexibly through procurement from multiple companies. 8. Our company directly trades with approximately 500 factories in China, so you can trust us to handle your needs with confidence.