Groundwater level lowering method associated with the construction of sewage treatment facilities in coastal lowland areas.
Prior to the SWP construction method, a pumping test was conducted! Successful in achieving a favorable drop in groundwater level.
In the construction of the sewage treatment facility (inflow pump building) under construction in Nishi Ward, Fukuoka City, a "pumping test was conducted prior to the implementation of the Super Well Point Method." The test site was under pressure, and to achieve the necessary water level for preventing heave, a significant amount of groundwater needed to be pumped out. Concerns about the lowering of groundwater levels in the surrounding area led to a comparative study of groundwater lowering methods. By employing the "SWP method," which has a high pumping capacity, groundwater level reduction was achieved, and subsequent pumping tests confirmed that the intended objectives were met. [Test Details] ■ Test Site: Sewage treatment facility construction in coastal lowland area (Nishi Ward, Fukuoka City) ■ Adopted Method: Super Well Point Method ■ Test Content: Pumping Test *For more details, please refer to the PDF document or feel free to contact us.
Inquire About This Product
basic information
For more details, please refer to the PDF document or feel free to contact us.
Price range
Delivery Time
Applications/Examples of results
For more details, please refer to the PDF document or feel free to contact us.
catalog(1)
Download All CatalogsCompany information
We are actively engaged in development, design, research, and construction work related to ground improvement projects, focusing on methods for lowering groundwater levels.