High pumping capacity! A comparison of the Super Wellpoint method and other groundwater lowering methods.
This document compares three groundwater lowering methods: the "Super Well Point Method," the "Deep Well Method," and the "Well Point Method." It provides detailed information on each method, including an "Overview Diagram," "Principles (Pumping Methods)," and "Advantages and Disadvantages." The Super Well Point Method is effective not only for lowering groundwater levels but also for countermeasures against bulging, promoting consolidation, and landslide prevention. It is often adopted as a widespread groundwater lowering method for facilities such as adjustment ponds. We encourage you to read it. [Contents] ■ Methods (Function Distribution) ■ Overview Diagram ■ Principles (Pumping Methods) ■ Supplementary Principles ■ Advantages and Disadvantages *For more details, please refer to the PDF document or feel free to contact us.
Inquire About This Product
basic information
**Main Advantages and Disadvantages** ■ Super Well Point (SWP) Method - High pumping capacity allows for lowering groundwater levels with fewer points. - Even with lowered water levels, collection continues due to negative pressure, enabling shallow well installation. - Groundwater level reduction progresses relatively well even in cohesive soils like silts with low permeability coefficients. ■ Well Point (WP) Method - Forced drainage utilizing negative pressure is efficient for lowering water levels, but the reduction is around 3.5 meters. - Installation spacing is typically 0.8m to 2.0m, with a water intake capacity of about 20L/min per point. - Capacity decreases if air is drawn through the gaps between the riser pipe and the ground. ■ Deep Well (DW) Method - Good workability and easy maintenance, but generally not applicable for soils with permeability coefficients below 10^-3 cm/sec. - Even within the applicable range, lower permeability soils require more wells due to collection capacity, resulting in longer times for water level reduction. *For more details, please refer to the PDF document or feel free to contact us.*
Price range
Delivery Time
Applications/Examples of results
For more details, please refer to the PDF document or feel free to contact us.
catalog(1)
Download All CatalogsCompany information
We are actively engaged in development, design, research, and construction work related to ground improvement projects, focusing on methods for lowering groundwater levels.