Himuro Corporation manufactured framework scaffolding components [Diagonal brace - Lower handrail]
In addition to the initial plating, a type with excellent corrosion resistance using PPZ (Perfect Post Zinc Coated Steel Pipe) is also available for selection.
We handle inch and meter sizes, as well as various types from different manufacturers, so we can guide you to products that match your preferences and available materials. In addition to standard maintenance items, we also have exceptionally clean shot-blasted maintenance items. 【Diagonal Brace】 ■ Thickness 1.9mm (minimum standard of the temporary construction industry association is 1.6mm) ■ Inch and meter sizes - various types can be manufactured ■ In addition to pre-plating, a type with excellent corrosion resistance using PPZ (Perfect Post Zinc Steel Pipe) is also available 【Lower Handrail】 ■ Diameter 27.2mm, thickness 1.6mm (minimum standard of the temporary construction industry association is 1.3mm) ■ Inch and meter sizes - various types can be manufactured ■ Comes with a sticker (cautionary notes) *For details, please contact us or download the PDF materials.
Inquire About This Product
basic information
【Muscle Deviation】 ■Thickness 1.9mm (Minimum standard of the temporary construction industry association 1.6mm) ■Inch and meter sizes - various types available for manufacturing ■In addition to pre-plating, a type with excellent corrosion resistance using PPZ (Perfect Post Zinc Steel Pipe) is also available for selection 【Lower Handrail】 ■Diameter 27.2, thickness 1.6mm (Minimum standard of the temporary construction industry association 1.3mm) ■Inch and meter sizes - various types available for manufacturing ■Comes with a sticker (cautionary notes) *For details, please contact us or download the PDF materials.
Price range
Delivery Time
Applications/Examples of results
For more details, please contact us or download the PDF.
catalog(2)
Download All CatalogsCompany information
Our company primarily engages in the buying and selling of temporary scaffolding materials, and we have over 1,000 customers nationwide, from Hokkaido to Okinawa. We constantly strive to maintain the number one inventory level in the country and work hard to meet various customer requests. We ship fully maintained scaffolding materials and temporary supplies throughout Japan and overseas. We also accommodate container loading and bulk shipments, so please feel free to contact us. We accept inquiries for estimates and delivery times. We have also started selling through our online shop. Search for "Scaffolding Frog."