Leave the design and installation of power plant equipment and facilities to us!
At Tokyo Power Corporation, we construct turbines, generators, boilers, and even auxiliary equipment, which are the main facilities of power plants. In the case of new installations, the construction period for a turbine generator and boiler facility with a capacity of 1 million kW is approximately 1 to 3 years. All machinery is from top manufacturers, and we collaborate with their engineers to carry out assembly, installation, and trial operation on-site. We have acquired specialized and extensive skills to install and maintain not only electrical equipment but also all types of facility equipment. 【Business Items】 ■ Design and installation work for various power plant equipment and facilities ■ Design and installation work for various machinery and auxiliary equipment ■ Design and construction of various piping ■ Worker dispatch services ■ All operations incidental to the above *For more details, please download the PDF or feel free to contact us.
Inquire About This Product
basic information
【Types of Construction Industry】 ■ Plumbing Work ■ Steel Structure Construction ■ Machinery and Equipment Installation ■ Scaffolding and Earthwork ■ Electrical Work *For more details, please download the PDF or feel free to contact us.
Price range
Delivery Time
Applications/Examples of results
For more details, please download the PDF or feel free to contact us.
catalog(1)
Download All CatalogsCompany information
Tokyo Power Corporation is a company that meets various needs in the equipment installation construction industry. We mainly handle the construction, maintenance, and dismantling of power plant facilities. Based on the technology we have cultivated over half a century, we provide the technology and services that respond to our customers' trust. Please feel free to contact us if you have any requests.