Slope lift "Super Tower RN UP106RN" *Installation examples now available.
Uniper slope lift UP106RN
The mega-solar construction on slopes and slope renovation work is highly effective! It can lift up to approximately 95 meters and achieves a high-speed hoisting of 30 to 35 meters per minute!
The aluminum single rail hoisting machine boasts the strongest strength and has been adopted for rental use since 2013. It is actively used as a temporary lift for slope construction on mountain slopes and stairs, as well as at mega-solar installation sites and civil engineering construction sites. It allows for safe operations with a focus on improving work efficiency, reducing costs, and ensuring compliance. It can also be used for slope work beside railway tracks, stair renovation work, dam renovation work, and highway slope work. The rail length can be customized up to a maximum of 95 meters to suit the site. A 1000W winch enables high-speed lifting at 30 to 35 meters per minute. *It has also been used for the stone wall renovation work at Takeda Castle Ruins and Azuchi Castle Ruins, with installation examples available in the catalog!* 【Features】 ■ Capable of hoisting up to approximately 95 meters of rail length customized to the site ■ Achieves high-speed lifting of 30 to 35 meters per minute with a 1000W electric winch ■ Rail length and type of trolley can be customized to suit the site ■ Wire rope length can be used up to a maximum of 100 meters ■ Two types of electric winches to choose from *For more details, please refer to the catalog or feel free to contact us.*
Inquire About This Product
basic information
【Installation Examples】 - Mega solar installation site, slope and embankment installation site - Slope installation work beside railway tracks - Stair renovation work installation - Dam renovation work installation - Boring survey, transportation of equipment - Highway slope renovation work - Railway slope renovation work - Disaster area, embankment and slope renovation work - Coastal quay, transportation of materials - Slope in resort areas, transportation of luggage - Power line construction, renovation work and transportation of materials 【Product Details】 - Electric winch (UP711ZN, UP787A) - Aluminum rail (joint type) - Standard cart: H750mm × W650mm × D300mm - Long cart: H1200mm × W650mm × D300mm - Intermediate roller: Wire thread prevention roller (used attached to rail step) - Upper pulley (cap type): Inserted into the joint at the end of the rail for use - Standard curved rail: Used for sharp angle adjustments - Intermediate curved rail: Used for gentle angle adjustments - Rail support pillar: Three height options - Upper pillar: Two height options - Intermediate rail: Seven length options - Upper and lower limit switches: Upper limit and lower limit switches - Wireless remote control unit: UP700RC (optional)
Price range
Delivery Time
Applications/Examples of results
【Installation Examples】 〇 Mega solar installation site, slope and embankment installation site 〇 Slope installation work beside the railway 〇 Staircase renovation work installation 〇 Dam renovation work installation 〇 Boring survey, transportation of equipment 〇 Highway slope renovation work 〇 Railway slope renovation work 〇 Disaster area slope and embankment renovation work 〇 Coastal quay, transportation of materials 〇 Slopes in resort areas, transportation of luggage 〇 Power line construction, renovation work and transportation of materials ・Yamba Dam ・Azuchi Castle ruins, stone wall renovation work ・Takeda Castle ruins, stone wall renovation work
Detailed information
-
At the ruins of Azuchi Castle, stone walls were used for the stone wall repair work. A 70-meter long rail and a winch were installed above the rail.
-
The turret was assembled and used for the stone wall renovation work at Takeda Castle ruins, with a rail length of 30 meters and a winch installed at the top of the rail.
-
Installed as the elevation equipment for the Yamba Dam, the rail length is 65 meters, and the rail is custom-made of all stainless steel, with the winch installed at the top of the rail.
-
Used at the megasolar construction site on the mountain slope, the rail length is 36 meters, and the winch is installed under the rail.
-
Used for slope construction beside the train tracks. The winch with a rail length of 8 meters is installed above the rail.
-
Used for slope renovation work Winch with a rail length of 50m is installed on the upper part of the rail.
-
Installed on the slope of the mountain. Used for constructing houses at the summit where vehicles cannot access. The winch with a rail length of 60 meters is installed at the top of the rail.
-
Used for transporting luggage to the stairs. The winch is installed in the middle of the 10m long rail.
-
It was used for the installation of a sloped mega-solar system. The winch with a rail length of 40 meters is installed at the top of the rail.
News about this product(1)
Company information
Uniper Co., Ltd. has been committed to the mission of "challenging the art of lifting" since its establishment. As the needs on-site have changed year by year, we have developed, planned, and manufactured winches and lifting machines that are in line with the times, responding to the requests of many users. In the scaffolding industry, we offer "high-speed winches for scaffolding lifting"; in the roofing industry, we provide "tile lifting machines"; in the solar power industry, we have "solar panel lifting machines"; in the construction industry, we supply "board lifting machines"; and for use in warehouses and stores, we offer "simple temporary lifts." In recent years, we have also developed slope lifts that are installed and used for slope construction and stairs. We will continue to create products that satisfy users across various applications, prioritizing safety above all.