[Metal Processing Example] Aichi Prefecture JR Station Front Monument (Stainless Steel Canned Product)
This is a case study of the design and construction of a large stainless steel monument. It includes a comprehensive proposal that encompasses strength calculations and civil engineering work. For contracted processing, please contact Seiei!
This is a case study of a stainless steel monument. It is installed in front of a certain station in Aichi Prefecture. Under consultation with the local government office, we received a comprehensive order for design, strength calculations, and construction (civil engineering and metalworking). Material: Stainless steel Purpose: Large outdoor monument 【Features of Seiei's metal, resin, and rubber processing】 ■ Small lot support (from 1 piece) ■ Short delivery time support (same-day delivery possible for some projects) ■ Capable of handling everything from production to on-site construction ■ Proven track record with the Toyota Group and major general contractors *For more details, please feel free to contact us.
Inquire About This Product
basic information
For more details, please feel free to contact us.
Price range
Delivery Time
Applications/Examples of results
For more details, please feel free to contact us.
catalog(1)
Download All CatalogsCompany information
Seiei Co., Ltd. specializes in contract processing of metals, resins, and rubber, as well as Thomson die-cutting processing. We accept orders with ultra-short delivery times, starting from just one piece, thanks to our extensive network! Additionally, we can handle everything from production to on-site construction, and we have a proven track record with the Toyota Group and major general contractors. Please feel free to contact us with any inquiries.