Energy-saving case study that improved losses using a cyclone-type steam reforming device.
A large amount of drain was generated, and energy loss became a challenge. Upon investigating the cause, it was found that the steam generated from the regular boiler produced low dryness wet steam, resulting in a significant amount of drain in the piping. Therefore, a cyclone-type steam reforming device was introduced. The dry steam sent to the secondary steam header is less likely to become drain during transport to the factory, allowing it to be supplied to steam-using equipment and machinery in very good condition. In fact, after the introduction, we successfully achieved a cost reduction of 18% (over 10,000,000 yen annually). [Overview] ■ Equipment: Boiler ■ Industry: Food and Beverage Factory ■ Energy Saving Rate: 18% *For more details, please refer to the PDF document or feel free to contact us.
Inquire About This Product
basic information
【5 Free Services】 ■ Free On-Site Diagnosis Service ■ Trial Experience Campaign ■ Energy Saving Case Report from Factories Nationwide ■ On-Site Study Sessions ■ Monthly Newsletter *For more details, please refer to the PDF document or feel free to contact us.
Price range
Delivery Time
Applications/Examples of results
For more details, please refer to the PDF document or feel free to contact us.
catalog(1)
Download All CatalogsCompany information
Oshima Electric Co., Ltd. is a construction company specializing in electrical equipment, primarily operating in areas such as Ibaraki, Saitama, Tochigi, Chiba, and Gunma. We strive to provide proposal-based construction to make our customers' lives and business activities more convenient and comfortable. From design and construction to after-sales support, please leave all your electrical inquiries to us.