Manufacturing a panel tank of the same size! This is an example of renovation work due to the aging of the water storage tank.
Here is a case study of the replacement work for an FRP panel tank at a certain environmental center. The company faced the issue of water leakage due to the aging of the existing water storage tank. Therefore, after a site survey, a panel tank of the same size was manufactured, and replacement work was carried out on-site. 【Case Study】 ■ Manufacturing period: Approximately 30 days ■ Type of work: Equipment installation ■ Work duration: 2 days ■ Date/Location: March 2019/Gifu Prefecture ■ Equipment used: FRP panel tank *For more details, please refer to the PDF document or feel free to contact us.
Inquire About This Product
basic information
【Related Products】 ■FRP Tank ■PVC Ladder ■Ventilation Port ■Gauge Valve *For more details, please refer to the PDF document or feel free to contact us.
Price range
Delivery Time
Applications/Examples of results
For more details, please refer to the PDF document or feel free to contact us.
catalog(1)
Download All CatalogsCompany information
Based on over 40 years of know-how and technology as a manufacturer of components and equipment for wastewater treatment facilities, we offer proposals for facility improvements. 【Do you have any of these concerns?】 ◆ "I want to expand the facility or repair aging parts." ◆ "The deterioration of water quality is causing us to exceed wastewater discharge standards." ◆ "We are struggling with rising costs for chemicals and electricity." ◆ "I don't know how to manage the wastewater treatment facility." The Kansai Chemical Group is engaged in environmental business centered around water. Starting as a manufacturing company, we have cultivated solid technical skills, and each employee enhances their abilities, leading to the development of innovative products through refined sensibilities. We take pride in being Kansai Chemical Co., Ltd.