Also considering responses to internal controls! Achieving thorough cost management and shortening the closing process through the reconstruction of the core system.
We would like to introduce a case study on the implementation at M. Technique Co., Ltd., a manufacturer of dispersion and emulsification equipment. The company adopted "Factory-ONE Cyber Factory" as its sales and production management system to achieve real-time individual cost tracking, along with the accounting system "EXPLANNER/Ai" and the workflow system "EXPLANNER/FL," integrating its core systems. As a result, effects such as shortened closing periods and improved internal controls have been realized. [Case Study] ■ Implementation Site: M. Technique Co., Ltd. ■ Implemented Product: Production Management System "Factory-ONE Cyber Factory" *For more details, please refer to the PDF document or feel free to contact us.
Inquire About This Product
basic information
For more details, please refer to the PDF document or feel free to contact us.
Price range
Delivery Time
Applications/Examples of results
For more details, please refer to the PDF document or feel free to contact us.
catalog(1)
Download All CatalogsCompany information
Since our establishment in 1961, we have been involved in various system development and system construction projects. We visualize various "mechanisms," "arrangements," and "flows" in a wide range of social scenes, contributing to the infrastructure and business that support people's lives. Please feel free to contact us if you have any requests.