A simple retaining wall that realizes "productivity improvement." It contributes to labor and effort reduction!
★Lightweight components weighing around 600kg, easy to handle!! ■ There are few transportation restrictions, making it possible to transport and construct in narrow spaces. ■ Construction can be done with a crane-equipped backhoe, allowing for easy maneuverability. *1 ★Half precast structure!! ■ Significantly shortens construction time and achieves labor-saving and efficiency in construction. ■ Since it only involves stacking blocks, it minimizes the need for special tasks like formwork. *2 ■ The surface becomes precast material, allowing for a beautiful and high-quality finish. ★Thorough pursuit of construction efficiency!! ■ There are few types of blocks, making product management easy. ■ By setting the standard product length to 3.0m, construction efficiency can be greatly increased. ■ The use of joint pins makes alignment easy. *For vertical wall sections ■ Unifying the bolt specifications improves workability. ■ The special drainage hole shape also makes the installation of drainage pipes easy. ■ The sloped wall sections can also serve as scaffolding. *1 There may be restrictions depending on the working radius, etc. *2 Formwork for the ends and top concrete will be necessary.
Inquire About This Product
basic information
【Design Conditions】 The "Dragon Wall" consists of four types of concrete components: two product lengths of 3.0m and 2.0m, and two product widths of 625mm and 400mm, along with brackets to secure the front and rear components, allowing for the construction of a gravity retaining wall with a specified cross-section. The wall face slope can be set up to 7/10, making it compatible with both front-slope and back-slope types. Wall height: 0.5m to 5.0m Counter width: up to approximately 3.9m Wall face slope compatibility: up to 7/10 slope Superimposed load: Uniformly distributed load q=10.0kN/m² or less *For conditions other than those mentioned above, please inquire.
Price range
Delivery Time
Applications/Examples of results
For more details, please refer to the PDF document or feel free to contact us.
Detailed information
-
Product delivery
-
First stage installation
-
Second stage installation
-
Second stage installation
-
Installation by backhoe
-
Installation of the third section
-
Installation of fixed brackets
-
Assembly of components completed.
catalog(1)
Download All CatalogsCompany information
Our company, under the belief of contributing to society through the development of social infrastructure, constantly strives for quality improvement and technical advancement. With the conviction that business is about people, we respect humanity, engage in talent development and fair personnel practices, and cultivate a free and open corporate culture. We aim to deepen mutual understanding and trust, working together towards the development of the company and the enhancement of welfare, while concentrating all our efforts on stabilizing and expanding our management foundation.