[Scale Measures Case Study] Ryouzen Nishi-Shinjuku Store (Bento Delivery - Tokyo)
The bio-water peeled off the scale in the boiler inner tube after 2 weeks at 1/3 concentration!
We would like to introduce a case study from Rishin Nishi-Shinjuku Store (Bento Delivery, Tokyo). A scale removal field test was conducted. The Bio Water 1/3 was installed in the hyper steamer. Before installation, it was completely filled with scale, but after 2 weeks of installation, the scale began to peel off. [Case Study] ■ Location: Installation of Bio Water 1/3 in the hyper steamer *For more details, please refer to the PDF document or feel free to contact us. *The section titled 'Trigger for Interest' displayed during PDF download is generated by Ipros Inc.'s AI.
Inquire About This Product
basic information
For more details, please refer to the PDF document or feel free to contact us.
Price range
Delivery Time
Applications/Examples of results
For more details, please refer to the PDF document or feel free to contact us.
catalog(1)
Download All CatalogsCompany information
Our company was established in 2000 after becoming independent from a plumbing maintenance company with over 113 years of history. We focus on water quality improvement technology, addressing issues such as rust on the inner surfaces of water pipes and scale in heat exchangers. Under our corporate philosophy of "Sanpo Yoshi" (benefiting all three parties), we consistently provide optimal water environment solutions. *The section titled "Trigger for Interest" displayed during the PDF download is generated by AI from Ipros Inc.