A construction method for installation pipes using a combined auger and pressure insertion method that employs special branch pipes equipped with earthquake resistance and water tightness!
The "Strike Method" is a pipe installation and pushing method that combines effective ground improvement by injecting chemical solutions after the arrival of the casing pipe at the main pipe to be installed. Even when installing the main pipe under busy roads, construction can be carried out from a distant shaft, contributing to the alleviation of traffic congestion. 【Features】 ■ Installation of a φ150mm pipe onto a φ200mm PVC pipe ■ Installation onto fume pipes and shields ■ Starting from a φ2,000 casing shaft (a φ1,500 casing shaft is also possible; calculations are separate) ■ Injection of chemical solutions into the reaching section can be performed from within a φ1,500 casing pile ■ Adoption of special branches that are earthquake-resistant and watertight *For more details, please download the PDF or feel free to contact us.
Inquire About This Product
basic information
【Lineup】 ■STM-1535 ■STM-2040 *For more details, please download the PDF or feel free to contact us.
Price range
Delivery Time
Applications/Examples of results
For more details, please download the PDF or feel free to contact us.
catalog(1)
Download All CatalogsCompany information
Our company was established in 1968 and is headquartered in Yokohama City, Kanagawa Prefecture. We are a manufacturer that provides hydraulic system equipment that plays a role in infrastructure development, including water supply and sewage systems. We aim to contribute to society in the ever-expanding field of hydraulic technology and to develop and grow together with our customers.