Directly linked to cost reduction: Significant reduction in processing time for stainless steel parts.
Total processing time reduced from 200 minutes to 50 minutes! Introduction of a case study on stainless steel processing.
Here is a case study on the improvement of aircraft parts processing. The material is precipitation-hardened stainless steel. Before the improvement, the number of processing steps was 4, but by reviewing tool selection and material holding, it was improved to 2 steps. The total processing time was reduced from 200 minutes to 50 minutes. 【Case Study】 ■ Change of processing path: groove cutting → trochoidal (side) processing ■ Significant reduction of non-cutting time → elimination of wasted time ■ Review of tool selection → suitable for the material and large-diameter tools ■ Review of material holding → jigs that enable high-efficiency processing *For more details, please refer to the PDF document or feel free to contact us.
Inquire About This Product
basic information
For more details, please refer to the PDF document or feel free to contact us.
Price range
Delivery Time
Applications/Examples of results
For more details, please refer to the PDF document or feel free to contact us.
catalog(8)
Download All CatalogsCompany information
Our company specializes in cutting and processing aluminum, iron, and stainless steel. We excel in precision machining of high-precision parts and appearance-critical components where scratches are not allowed, catering to customer needs from small lots to mass production. We have expanded our processing capabilities to include parts for semiconductors and various devices, cleanroom and medical robot components, and in recent years, complex-shaped aircraft parts. We provide products and services with "absolute quality" to ensure customer satisfaction in terms of quality, precision, and delivery time.