Heatstroke prevention measures: Renovation for factories and warehouses (from investigation to construction)
Heat stroke measures, building maintenance, disaster prevention, labor accident measures, hygiene measures - Renovation for factories and warehouses (from investigation to construction).
Renovation for Factories and Warehouses (From Investigation to Construction) 【Heat Stroke Prevention】 - On-site Investigation Investigate the interior of the building, identify the main causes of heat, and propose effective countermeasures. - Example Measures Installation of high-performance aluminum heat insulation material "Keep Thermo Wall." Cut radiant heat from roofs exceeding 50°C. Indoor temperature reduced from 40°C to 32°C (outside temperature 32°C). 【Building Maintenance】【Disaster, Labor Accident, and Sanitation Measures】 - Roof, Exterior Wall, and Floor Painting High-durability fluororesin coating, forklift overturn prevention measures, disaster emergency roof signage. - Fireproof Coating 2-hour fire resistance construction for disaster response. - Safety Measures Ultra-durable hard coat film. - Virus Disinfection, Antibacterial, and Mold Prevention Contact infection prevention sheets, antiviral paint. - Soundproofing Measures Soundproofing for equipment and emergency staircases. - Energy Conservation Measures Factory energy-saving diagnosis. *For more details, please refer to the PDF document or feel free to contact us.*
Inquire About This Product
basic information
Renovation for factories and warehouses (from investigation to construction) 【Heatstroke measures】 【Building maintenance】 【Disaster, labor accident, and hygiene measures】 *For more details, please refer to the PDF document or feel free to contact us.*
Price range
Delivery Time
Applications/Examples of results
Examples of Heat Stroke Prevention Measures - General Warehouse (200m2) - Metal Processing Factory (120m2) - Automobile Maintenance Factory (360m2) - Metal Processing Factory (800m2) - Logistics Warehouse (1300m2) - Paint Manufacturing Factory (700m2)
Detailed information
-

Renovation for factories and warehouses (from investigation to construction)
-

We will conduct thermal diagnostics for factories and warehouses.
-

Example of aluminum heat-insulating sheet installation (warehouse 200m2)
-

Roof temperature difference (uninstalled 48℃, aluminum heat-insulating sheet 22℃)
-

Long-term verification results of aluminum heat insulation sheets
catalog(6)
Download All Catalogs
Company information
Aibec Co., Ltd. serves as a special agent for a major paint manufacturer, focusing on the sale of industrial paints to provide a more beautiful and functional color environment. Leveraging the trust and know-how built over many years, we offer services that are environmentally friendly and satisfy our customers through the coordination of paints, films, and auxiliary materials.







![Hydrogen Burner High Efficiency Recuperative Burner [STBW-H2]](https://image.mono.ipros.com/public/product/image/0de/2000909335/IPROS21829473659656073354.png?w=280&h=280)
![Aluminum Central Melting Furnace STM Series [Improved Fuel Efficiency with Unique De-gassing Chamber Structure]](https://image.mono.ipros.com/public/product/image/574/2001086005/IPROS46973604845558271850.png?w=280&h=280)
![[Processing Example] Disaster Prevention Wireless Enclosure](https://image.mono.ipros.com/public/product/image/2071035/IPROS13916187524459274252.png?w=280&h=280)