It is possible to reduce costs through improved operational efficiency and safety until product release, as well as lead time improvements!
We would like to introduce a case study of the "Automated Warehouse System" developed by TCC. This system is designed to efficiently transport goods to empty shelves automatically. It enables inventory management of the automated warehouse, management of inbound and outbound operations, control of loading/unloading to and from the vertical warehouse, and printing of management reports. Additionally, it allows for inventory information searches, management and reference of inbound and outbound performance, and data linkage with higher-level systems. 【Implementation Effects and Points】 - By automatically transporting goods delivered by suppliers to empty shelves, it improves operational efficiency and safety until shipment, and reduces costs through lead time improvements. - By automatically allocating and storing the same type of goods as close to each other as possible, it reduces the burden of inventory work and decreases inventory discrepancies and labor costs. *For more details, please refer to the PDF document or feel free to contact us.
Inquire About This Product
basic information
【Development Environment】 ■OS: Windows XP Professional ■DB: MSDE 2000 ■Development Language: Visual Basic .NET 2003 *For more details, please refer to the PDF document or feel free to contact us.
Price range
Delivery Time
Applications/Examples of results
【Usage】 ■Industry: Manufacturing ■Field: FA (Factory Automation) and Control *For more details, please refer to the PDF document or feel free to contact us.
catalog(1)
Download All CatalogsCompany information
Since our establishment, we have provided consistent engineering services centered around FA/control systems, from production planning and plant control to production management and logistics management. As we move forward into an era of further smart factory development and globalization, we will respond to our customers' diverse needs with the speed that only a small elite team can achieve, along with the solid technology we have cultivated over the years.


![[Case Study] IC Card-Based Attendance Management System](https://image.mono.ipros.com/public/product/image/d48/2000674773/IPROS70459150356379711063.png?w=280&h=280)
![[Development Case] Pharmaceutical Tank Water Level Monitoring System](https://image.mono.ipros.com/public/product/image/987/2000848208/IPROS95548632987726582506.png?w=280&h=280)
![[Development Case] Component Supply Instruction System](https://image.mono.ipros.com/public/product/image/1e0/2001133383/IPROS90377345943719495536.png?w=280&h=280)
![[Development Case] Raw Material Transfer Planning System](https://image.mono.ipros.com/public/product/image/d8c/2001454663/IPROS71709784846155816094.png?w=280&h=280)
![[Development Case] Progress Management System](https://image.mono.ipros.com/public/product/image/2084833/IPROS17518671279415691054.png?w=280&h=280)
![[Development Case] New Residential Construction Audit System](https://image.mono.ipros.com/public/default/object/noimage_l.gif?w=280&h=280)

![[dbSheetClient Implementation Case] Sumitomo Riko Logistics Co., Ltd.](https://image.mono.ipros.com/public/product/image/276540/IPROS4554830099144105182.png?w=280&h=280)
![[Case Study] ERP Business Management System](https://image.mono.ipros.com/public/product/image/2107410/IPROS13943766551647626376.png?w=280&h=280)
![[System Development Case] Real Estate Company A](https://image.mono.ipros.com/public/product/image/012/2000647045/IPROS38985784623380600322.png?w=280&h=280)