For gymnasiums where regular air conditioning installation is not possible, "Spot Bazooka" is the solution! Introduction of case studies.
We would like to introduce the case of Chikushi Jogakuen University, which implemented measures against heat stroke for classes and club activities. Due to the aging of the gymnasium, the university had previously been unable to install conventional air conditioning. However, with the installation of "Spot Bazooka," they were able to conduct physical education classes and club activities without worrying about heat stroke, creating a comfortable environment. Additionally, a safety net was installed as a precaution, ensuring safe use by preventing fingers from getting caught. The drainage of condensation water is managed with a tank. 【Implementation Overview】 ■ Location: Chikushi Jogakuen University, Fukuoka Prefecture ■ Number of units installed: 4 integrated units ■ Installation date: July 2020 *For more details, please refer to the PDF document or feel free to contact us.
Inquire About This Product
basic information
For more details, please refer to the PDF document or feel free to contact us.
Price range
Delivery Time
Applications/Examples of results
For more details, please refer to the PDF document or feel free to contact us.
News about this product(1)
Company information
Ease Co., Ltd. examines various aspects such as the environment surrounding the energy industry, market size, energy pricing structures, construction feasibility, and customer needs, starting with agricultural, heatwave countermeasures, and school air conditioning equipment, and transforms "ideas" into tangible "products and services." Additionally, we study distribution channels, sales routes, and industry price ranges to work on creating a "selling mechanism." Please feel free to contact us if you have any requests.