The method of "belly support construction" using underwater concrete, which incorporates precast residual formwork as part of the structure.
<Ensuring Safety and Planning> ■ The residual formwork method allows for construction in stages, eliminating enclosure and enabling quick evacuation actions in emergencies. ■ The residual formwork itself is self-supporting, making it possible to work safely underwater. ■ It is possible to ensure planning for offshore construction, which is easily affected by weather and sea conditions. <Economic Efficiency and Improved Workability> ■ The absence of enclosed spaces improves work efficiency, leading to a reduction in construction time. ■ The lightweight of the products allows for construction using small machinery. ■ In conventional methods, a minimum width of 1.0 m was often required for underwater working space, leading to designs based on stability calculations that exceeded this width. However, with the residual formwork method that does not require enclosed spaces, designs can be made according to stability calculations, reducing the amount of concrete needed. <Simplification of Material Procurement> ■ Due to staged construction, securing ready-mixed concrete is easy and workability is good, allowing for small-scale placements in fishing port construction. ■ Material delivery is limited to the staged construction, reducing yard area and simplifying yard planning.
Inquire About This Product
basic information
Price range
Delivery Time
Applications/Examples of results
For more details, please refer to the related links or feel free to contact us.
Detailed information
-
Installation of foundation work (such as waste stone) Foundation work (such as waste stone) will be installed for the setup of formwork.
-
Installation of formwork can be easily done from land using a crawler crane or similar equipment.
-
Work on the first stage formwork involves removing the separator and pouring underwater concrete.
-
Second stage installation work Remove the latency, set up guides, install the second stage formwork, and perform the same work as in the first stage.
-
Formwork for the topmost section This is the precast concrete formwork that has been assembled and poured with underwater concrete up to the topmost section.
-
Work on the first stage formwork Shaping is done in the superstructure. Align the normals and level the plane in the superstructure, then shape it.
Company information
Our company, under the belief of contributing to society through the development of social infrastructure, constantly strives for quality improvement and technical advancement. With the conviction that business is about people, we respect humanity, engage in talent development and fair personnel practices, and cultivate a free and open corporate culture. We aim to deepen mutual understanding and trust, working together towards the development of the company and the enhancement of welfare, while concentrating all our efforts on stabilizing and expanding our management foundation.