We will respond flexibly to unexpected troubles during nights and holidays, as well as of course to regular inspections and periodic maintenance.
【Content】 ■Inspection ■Replacement of the outer shaft main bearing ■Replacement of the labyrinth (motor side) 【Main Flow of Maintenance】 1. First, conduct an inspection → Marks indicating wear were found on the inner surface of the casing, leading to parts replacement. 2. Replace the outer shaft main bearing. 3. Address any issues discovered during maintenance → A breakage of the labyrinth (motor side) was found during maintenance work, so it was replaced with a new part. 4. Conduct a standalone test run in the presence of the customer to confirm that there are no abnormalities in operation, and complete the work. *The parts subject to construction come with a one-year performance guarantee from the completion date. In addition to daily inspections, conducting regular maintenance is the most important point to maximize the functionality of equipment and extend its lifespan. If you have any concerns at the plant, please feel free to contact us.
Inquire About This Product
basic information
Please contact us.
Price range
Delivery Time
※24/7 support
Applications/Examples of results
Please contact us.
catalog(5)
Download All CatalogsCompany information
Our company has been dedicated to plant maintenance for many years. Utilizing this know-how, we will contribute to society through energy conservation and labor-saving measures towards the automation of factory equipment and the realization of unmanned factories using IT and AI.