The feature of going online is that the output control time is short and the generator opportunity loss is small. *This applies to the jurisdictions of Kyushu, Hokkaido, Tohoku, Hokuriku, Chugoku, and Shikoku Electric Power.
I will introduce the topic of "Online Transition of the Old Rule Solar Power Plant." Under the old rule, there are many controls in place for offline operations at the power plant, resulting in significantly greater generation opportunity losses compared to online operations. Annual output control is concentrated from February to May, while after June, there is a high power demand and less output control. By completing the transition to online by February 2022, we can reduce subsequent generation opportunity losses. 【Online Transition (Please Compare)】 <Operations by Plant Manager> ■ONLINE: Not required ■OFFLINE: Required <Time> ■ONLINE: Less output control time, smaller generation opportunity losses - Example: 12:00 PM to 2:30 PM / 2.5 hours ■OFFLINE: More output control time, larger generation opportunity losses - Example: 8:00 AM to 4:00 PM / 8 hours <Output Stop on Site by Manager> ■ONLINE: Automatic control ■OFFLINE: On-site response to stop <Remote Control for PCS ON/OFF> ■ONLINE: Automatic control ■OFFLINE: Remote OFF operation at specified time *For more details, please refer to the PDF document or feel free to contact us.
Inquire About This Product
basic information
[Recommendations for the Online Transition of Offline Power Plants under Old Rules] ■ Output control is concentrated from February to May each year, with significant power demand and less output control after June. ■ If an application is submitted in February 2022 to enable online control, it will be possible to reduce the output control power for the fiscal year 2021 (February-March 2022) and the fiscal year 2022, thereby decreasing lost opportunities for power sales. ■ Change the specifications of the PCS (output control unit) for Kyushu Electric Power to enable online control. - Online application and approval, construction. - Equipment updates for PVU-Finder that have been in place for 7 years after installation. ■ Proposal for the online transition of offline power plants in Hokkaido, Tohoku, and Hokuriku Electric Power areas, where output control was avoided during the 2021 Golden Week. *For more details, please refer to the PDF document or feel free to contact us.
Price range
Delivery Time
Applications/Examples of results
[Differences Between Offline and Online in Old Rules] ■ Offline Case 1 (Output stop on-site by the administrator) ■ Offline Case 2 Remote operation for PCS ON/OFF ■ Online Transition *For more details, please refer to the PDF document or feel free to contact us.
catalog(1)
Download All CatalogsCompany information
Our company is a comprehensive wiring system manufacturer that specializes in extrusion molding technology and wire processing technology, producing and selling equipment wires, various wire harnesses, solar power wiring units (PVUs), and more. We began overseas production of wire harnesses for consumer devices early on and have since developed into a global company with bases in seven countries. We are committed to providing products and services that meet our customers' needs, and thanks to this effort, we have grown into a leading company in the domestic market for wire harnesses for consumer industrial equipment, based on our core business of wires, and we are ranked among the top in the PVU industry.