If you are considering introducing or renovating new equipment, please feel free to consult with Technocrat!
【Content】 ■ Cable connection between control panel and operation panel ■ Modification of control panel ■ Connection of power cable from control panel to liquid delivery pump ■ Signal wiring from control panel to solenoid valve panel ■ Connection of swing vent switch and flow meter signal line ■ Connection of air tube from solenoid valve panel to auto valve 【Details of the Work】 1. Connect AC 100V power supply and communication LAN cable from the control panel to the operation panel via the ceiling. 2. Modify the inverter and breaker due to capacity changes associated with the addition of a liquid delivery pump. 3. Connect the power cable at the external terminal block inside the control panel to the liquid delivery pump. 4. Add wiring for solenoid valve output signal line inside the control panel, connecting from the relay terminal to the external terminal block, and then to the solenoid valve panel using a spare selection. 5. Connect the flow meter and swing vent sensor, along with the associated wiring. 6. Connect various piping for the solenoid valve air tube. 7. Conduct a standalone trial operation in the presence of the customer to confirm that there are no abnormalities in operation and complete the work. * The work area is covered by a one-year performance guarantee from the completion date. If you are considering introducing or modifying new equipment, please feel free to consult with us.
Inquire About This Product
basic information
Please contact us.
Price range
Delivery Time
※Available 24 hours a day, 365 days a year.
Applications/Examples of results
Please contact us.
catalog(4)
Download All CatalogsCompany information
Our company has been dedicated to plant maintenance for many years. Utilizing this know-how, we will contribute to society through energy conservation and labor-saving measures towards the automation of factory equipment and the realization of unmanned factories using IT and AI.