Achieve weight reduction and shortened lead time! Please consider this as material for VE VA proposals.
The process for conventional materials (SCM or FCD450) was primary processing → heat treatment → heat treatment → grinding processing. The process for the new material (cast high-strength cast iron 800) is casting → final finishing. This achieves weight reduction and shorter lead times, allowing for an 8% weight reduction compared to steel with the same shape. Please consider this material as a VE VA proposal. 【Features】 ■ Process for the new material (cast high-strength cast iron 800) - Casting → final finishing ■ Achieves weight reduction and shorter lead times ■ Allows for an 8% weight reduction compared to steel with the same shape *For more details, please refer to the PDF document or feel free to contact us.
Inquire About This Product
basic information
【Specifications】 ■Material: Iron, Steel, Assembled Products ■Lot: 1,000 to 10,000 pieces ■Precision: Within general tolerance range *For more details, please refer to the PDF document or feel free to contact us.*
Price range
Delivery Time
Applications/Examples of results
【Industry】 ■Automotive (Prototype) ■Automotive (Mass Production) ■Automotive Electrical Components *For more details, please refer to the PDF document or feel free to contact us.
catalog(1)
Download All CatalogsCompany information
Our company primarily manufactures and sells gas, water, and other piping fittings, as well as building and industrial machinery parts, and engages in prefabricated piping processing. We handle fittings for general water supply, hot water supply, air conditioning piping, and gas piping, as well as ductile iron products. We are committed to understanding societal needs and working on the development of unique products and quality improvement.