[Construction Case] Remote Monitoring of Material Delivery (Fuji City, Shizuoka Prefecture)
Remote monitoring utilizes long-range wireless communication devices. Stable video transmission is possible without monthly communication fees.
We would like to introduce a case study of our construction work. The customer's material delivery site is located 1.5 km away from our headquarters factory, requiring multiple round trips between the headquarters and the delivery site each day to monitor truck congestion and handling conditions. By utilizing network cameras and long-range wireless communication devices, we can check the situation at the remote site in real-time from the headquarters office. There are no monthly communication costs such as SIM communication, making it highly cost-effective. 【Equipment Used】 ■ 1 x 5MP IP Camera PTZ ■ 4-channel Network Video Recorder ■ 4K Monitor ■ Long-range Wireless Communication Device (High Frequency Band) *For more details, please refer to the related links or feel free to contact us.
Inquire About This Product
basic information
For more details, please refer to the related links or feel free to contact us.
Price range
Delivery Time
Applications/Examples of results
For more details, please refer to the related links or feel free to contact us.
catalog(1)
Download All CatalogsCompany information
We support safety and health measures on-site and the efficiency of management operations by utilizing cameras and sensors. We have extensive construction experience mainly in manufacturing plants and logistics hubs. Our strengths are: 1. Advanced construction technology specialized in industrial fields. 2. System design capabilities unique to a multi-vendor approach. 3. Speedy construction (our highly specialized construction staff can complete projects that typically take 3 to 4 days in just 2 days). 4. Comprehensive post-installation maintenance and operational support. For safety measures and environmental improvements at factories and distribution centers, trust our company with our rich track record.


![[Construction Case] Clean Room Work Record (Kasugai City, Aichi Prefecture)](https://image.mono.ipros.com/public/product/image/0af/2000698701/IPROS23090554441152081803.png?w=280&h=280)
![[Construction Case] Security Measures for Stores (Nagoya City, Aichi Prefecture)](https://image.mono.ipros.com/public/product/image/d4d/2000698704/IPROS12381427238661134914.png?w=280&h=280)
![[Construction Case Study] Quality Control in a Factory (Odawara City, Kanagawa Prefecture)](https://image.mono.ipros.com/public/product/image/eb9/2000698712/IPROS05933352817770873358.png?w=280&h=280)
![[Construction Case Study] Safety and Health Management in a Factory (Konan City, Aichi Prefecture)](https://image.mono.ipros.com/public/product/image/afd/2000698713/IPROS14308040412166647715.png?w=280&h=280)
![[Construction Case] Safety and Health Management in a Factory (Ichinomiya City, Aichi Prefecture)](https://image.mono.ipros.com/public/product/image/a95/2000698725/IPROS39660259102580416981.png?w=280&h=280)
![[Video] Introducing how to install G-cam in a video!](https://image.mono.ipros.com/public/product/image/828/2000692140/IPROS55061787263698476335.png?w=280&h=280)





![[For the pharmaceutical manufacturing industry] Digitizing entry management in oxygen-deficient hazardous work.](https://image.mono.ipros.com/public/product/image/20a/2001525768/IPROS14827379347403299223.jpg?w=280&h=280)
![[For the food manufacturing and beverage manufacturing industry] Digitizing the management of oxygen deficiency hazard work in tank entry.](https://image.mono.ipros.com/public/product/image/bf8/2001525769/IPROS12773363766147418267.jpg?w=280&h=280)
