Supplying all generated power to the power company! This is a power plant that has two types of generators: "synchronous generators" and "induction generators."
A water conveyance route of approximately 1.9 km has been established from the Tsuchida Shimosen headworks, which takes water from the Nagase River, to the power station. Utilizing a drop of about 43.03 m, two turbines are operated using a maximum of 3.75 m³/s of water taken from the irrigation water.
Inquire About This Product
basic information
The maximum output of this power plant is approximately 990 kW from two water turbines, generating enough electricity for about 1,000 households for a year. The generated electricity is supplied in full to the power company. This power plant is unique in the country, featuring two types of generators: a fully-fledged "synchronous generator" and a simpler "induction generator." In an era where technological decline and the inheritance of technology are being discussed, it is widely open for the training of hydroelectric power engineers, contributing to the improvement of hydroelectric power in Japan and serving as a usable facility.
Price range
Delivery Time
Applications/Examples of results
[ Specifications ] Waterway Name: Tsuchida Shimo Seki Waterway (Managed by Inawashiro Town Land Improvement District) Power Generation Type: Waterway Type (Inflow Type) Waterway Length: Approximately 1,900m Total Drop: 43.03m Maximum Water Usage: 3.75 m³/s Maximum Power Plant Output: Approximately 990kW (when operating 2 turbines simultaneously) Annual Power Generation: Approximately 3,200MWh Turbines: Horizontal Axis Single Wheel Single Flow Francis Turbines, 2 units - 790kW × 1 unit (rated output) - 280kW × 1 unit (rated output) Generators: Three-phase AC Induction Generator - 750kW × 1 unit (rated output) Three-phase AC Synchronous Generator - 305kVA × 1 unit (rated capacity) Tsuchida Shimo Seki Headworks Nagase River Water Pressure Pipeline (FRPM Pipe) Total Length: Approximately 1900m Water Tank: EL643.74m Tsuchida Shimo Seki Waterway Inawashiro Small Hydropower Plant: EL600.71m Transmission Line
Company information
Energia Corporation provides "local energy services" by mixing renewable energy from diverse small-scale and decentralized renewable energy facilities to supply heat and electricity. It simultaneously implements "local production and external sales" of electricity utilizing the FIT (Feed-in Tariff for renewable energy) system and "local production and consumption" of thermal energy.