Significant reduction of heavy metal-containing wastewater【Reducing waste volume and disposal costs!】
It is possible to reduce waste volume and disposal costs! We achieve low running costs through the MVR method!
We propose a reduction in waste volume through distillation for manufacturers of electroless nickel plating and those with plating processes. This addresses the challenge of "high TDS in raw water and difficult wastewater treatment," reducing waste volume and disposal costs. We have examples of 90% volume reduction. Our technology separates water and other components through distillation, enabling low running costs using the MVR method. 【Overview】 ■ Target Industries and Process Examples - Manufacturers of electroless nickel plating - Manufacturers with plating processes ■ Effects - Examples of 90% volume reduction - Reduction in waste volume and disposal costs *For more details, please refer to the PDF materials or feel free to contact us.
Inquire About This Product
basic information
For more details, please refer to the PDF document or feel free to contact us.
Price range
Delivery Time
Applications/Examples of results
For more details, please refer to the PDF document or feel free to contact us.
catalog(1)
Download All CatalogsCompany information
Since our establishment over 25 years ago, we have been a comprehensive business company specializing in reducing environmental impact related to by-products and waste generated in the manufacturing process, engaging in equipment manufacturing and sales, trading, consulting, and business investment. Through proposals for reduction, reuse, recycling, monetization, and optimization of industrial waste treatment, we achieve "reduction of environmental impact," "cost reduction and profit improvement," and "streamlining of operations."