Large transformer-reactor.
Nichiyou Electric Co., Ltd. (Design, manufacturing, and sales of transformers/coils/reactors from small lots of 1 piece) Sendai Sales Office (Snow melting (road heating, floor heating, electrical materials))
The shape can be discussed separately! Introducing the manufacturing range of single-phase transformers, three-phase transformers, and reactors.
At Nichiko Electric Co., Ltd., we accept custom orders for transformers. For the production of single-phase transformers, three-phase transformers, and reactors, the shapes can be discussed separately. High-current reactors can be accommodated with copper bar winding. We can also provide solutions for harmonics. Please feel free to contact us when you need assistance. 【Production Range】 ■ Single-phase transformers: up to 150kVA (50/60Hz) ■ Three-phase transformers: up to 200kVA (50/60Hz) ■ Reactors: equivalent to up to 50kVA *For more details, please refer to the PDF materials or feel free to contact us.
Inquire About This Product
basic information
【Other Features】 ■ Shape: Can be discussed separately ■ Support for large current reactors (300A to 1500A) with copper strip winding (maximum 2P 0.5t to 1.2t-300w) ■ Products for harmonic countermeasures are also available *For more details, please refer to the PDF document or feel free to contact us.
Price range
Delivery Time
Applications/Examples of results
For more details, please refer to the PDF document or feel free to contact us.
catalog(4)
Download All Catalogs![Large transformer reactor (custom-made) [Nikko Electric Co., Ltd., a transformer manufacturer in Miyagi Prefecture]](https://image.mono.ipros.com/public/catalog/image/01/c97/438068/IPROS34340332422357300542.jpeg?w=120&h=170)

News about this product(13)
Company information
The booth for the TECHNO-FRONTIER2025 Power System Exhibition has been announced. The Nikkou Electric booth is 【4-F36】. Exhibition: "TECHNO-FRONTIER2025 Power System Exhibition" Dates: July 23 (Wednesday) to July 25 (Friday), 2025 Time: 10:00 AM to 5:00 PM Location: Tokyo Big Sight, West Exhibition Hall Booth: 【4-F36】 We look forward to connecting with many of you this year as well. Please be sure to stop by our booth! Nikkou Electric's new base, Satellite Akiba (Tokyo, Akihabara), opened in February 2024. We aim to connect our sales team with factory technology and the web to provide real-time proposals for the most suitable transformers for our customers. If you have any issues regarding transformers, coils, or reactors, please feel free to consult with Nikkou Electric. We will propose the optimal transformer through discussions with our customers.