Design load T-25 compatible and road width expanded to 8m! Repair and reinforcement work on the bridge using grid metal.
We would like to introduce a case study of the "Grid Metal Method" that our company handles. We carried out bridge repair work on the Nyu-no-ki Bridge, a first-class bridge built in 1964, located on National Route 120. To accommodate the design load from T-20 to the current standard of T-25 and to widen the road from 7.7m to 8m, we reinforced the deck slab. Grid metal was placed in the cantilevered section. 【Case Overview】 ■ Project Name: Bridge Repair Work on Nyu-no-ki Bridge, National Route 120 ■ Client: Tochigi Prefecture, Nikko Civil Engineering Office ■ Construction Scale - Deck slab thickening work: 578m2 (of which, grid metal placement: 244m2) ■ Construction Period: April 2020 to March 2021 *For more details, please refer to the PDF document or feel free to contact us.
Inquire About This Product
basic information
【Reinforcement Specifications for Grid Metal Method】 ■ Grid Metal: Type A, thickness 12mm (galvanized) ■ Primer Application: Penetrating KS Primer ■ Adhesive Application: Epoxy Resin Adhesive (KS Bond) ■ Steel Fiber Reinforced Concrete (SFRC) *For more details, please refer to the PDF document or feel free to contact us.*
Price range
Delivery Time
Applications/Examples of results
For more details, please refer to the PDF document or feel free to contact us.
catalog(1)
Download All CatalogsCompany information
JFE Civil Corporation has been developing its business in various fields based on its achievements and technical capabilities in maintaining JFE Steel's steelworks for many years. We deliver valuable business from planning to construction and maintenance support. We are the only general construction company in the JFE Group.