Using genetic algorithms, we will automatically create plans for stacking and unstacking.
● Main Features of the Sakura Scheduler - Advanced optimization logic (Lagrangian relaxation method, genetic algorithms) - Support for flexible production environments - Overall optimization scheduling - Optimization that also reduces setup time - Scheduling that reflects actual performance - Input and output using Excel (CSV)
Inquire About This Product
basic information
● Constraints handled by the Sakura Scheduler - Machine constraints: Calendar settings can be configured for each machine. Supports automatic operation machines with setup and return settings. - Personnel constraints: Calendar settings can be configured for each personnel. It is possible to set up configurations that require personnel only for preceding and following setups plus fixed times. Supports fluctuations in personnel throughout the day. - Tool (jig, mold) constraints: If a jig is broken, it is possible to reduce the number of available jigs. - Precedence relationship constraints - Raw material arrival time constraints 【Price Range】 98,000 yen (can be installed on any number of computers within one company) *Additional costs will be incurred if training and implementation support are required.
Price range
P2
Delivery Time
Applications/Examples of results
【Sakura Scheduler Suitable Production Environment】 - Make-to-order and mixed production environments It can be adapted by setting the planned date in the production management system to the delivery date, even for forecast production. - Individual or lot production environments It supports discrete production environments but is not suitable for process production environments like chemical products. - Both processing and assembly production environments In assembly production environments, automatic generation of in-house parts jobs using a bill of materials (BOM) is possible. It can automatically expand required quantities and output a list of necessary materials.
catalog(1)
Download All CatalogsCompany information
Our company was founded in 2001 and provides practical consulting to support improvement activities in the manufacturing industry, including revenue enhancement, productivity improvement, lead time reduction, and inventory reduction through the introduction of DX systems. Based on our unique production management method, the "One-Piece Flow Production System," we create tailored original programs that address each company's specific management challenges, progressing from "on-site improvements" to "system improvements" and then to "production innovation," providing appropriate solutions. If you encounter any issues that need to be resolved, please feel free to contact us. We will definitely provide solutions that satisfy your company. [Astec Consulting HP] https://www.ast-c.co.jp/