The clean class has cleared 10,000! Introducing Yoshida Industries' cleanroom construction achievements.
Due to the damage caused by the Great East Japan Earthquake, the equipment was affected, and they were unable to assemble and inspect the artificial satellites, leading to a request for assistance. The size is quite large at 12×8.4×H14m, with a delivery time of one and a half months, starting around mid-March when logistics were also paralyzed. We installed a clean room with air conditioning, achieving a clean class of 10,000. We were able to meet the delivery deadline, which greatly pleased the customer. [Background of Implementation] - Equipment was damaged in the Great East Japan Earthquake, making it impossible to assemble and inspect artificial satellites. - The size is quite large at 12×8.4×H14m. - The delivery time was one and a half months, starting around mid-March when logistics were also paralyzed. *For more details, please refer to the PDF document or feel free to contact us.*
Inquire About This Product
basic information
【Results】 ■ Installed a clean room with air conditioning functionality ■ Met the delivery schedule, which greatly pleased the customer ■ Construction duration: 10 days ■ Cleanliness level: Class 10,000 *For more details, please refer to the PDF document or feel free to contact us.
Price range
Delivery Time
Applications/Examples of results
For more details, please refer to the PDF document or feel free to contact us.
catalog(1)
Download All CatalogsCompany information
Yoshida Industries provides appropriate local exhaust systems for harmful gases, vapors, and dust to create a comfortable working environment. In addition, we offer custom-designed large equipment such as large painting booths and simple clean rooms tailored to our customers' needs. We have a track record of installations in various locations across the country.