Distributing the heat from the thermal storage tank through the header, circulating for heating and cooling! A case study of heat supply to the municipal office building.
This is an introduction to a case where a biomass boiler was installed for heating and cooling at the Nakanojo Town Hall and Nakanojo Town Health Center. With a 300 kW biomass boiler, the biomass coverage rate achieved is 100% for heating and over 90% for cooling. Regarding cooling, due to the characteristics of the absorption chiller, selecting equipment based on peak load results in oversized equipment. Therefore, during the summer peak, the existing absorption chiller on the town hall side is used as a supplement. [Case Overview] ■ Main Equipment Supplied - KWB 300 kW Biomass Boiler - 6,000L Thermal Storage Tank - Flow Control Valve - Combined Supply and Return Header *For more details, please refer to the PDF document or feel free to contact us.
Inquire About This Product
basic information
For more details, please refer to the PDF document or feel free to contact us.
Price range
Delivery Time
Applications/Examples of results
For more details, please refer to the PDF document or feel free to contact us.
catalog(6)
Download All CatalogsCompany information
WB Energy Co., Ltd. is an engineering company specializing in wood biomass energy. We mainly handle products from KWB, a well-known Austrian manufacturer of mass-produced biomass boilers, and heat conduits for district heating from Radius-Kelit, an Austrian company known for their excellent insulation performance and durability. Please feel free to contact us if you have any inquiries.