[Case Study] Achieving a reduction in construction time by utilizing pre-fabricated water supply and drainage piping.
Reducing noise, dust, and odor issues caused by on-site work! Here are examples of utilizing pre-processed products.
There was a challenge in shortening the construction schedule due to the time-consuming process of material arrangement, cutting of PVC pipes, and gluing of PVC fittings using limited equipment on-site. We confirmed the specifications such as the shape and dimensions of the PVC piping used on-site, as well as the bonding points between the PVC pipes and fittings, created the drawings, conducted prototypes, and mass-produced pre-processed PVC piping for delivery to the site. After implementation, the on-site work time was reduced from about 3 days to 1 week, allowing for a shortened construction schedule. 【Case Overview】 ■ Challenge - Difficulty in shortening the construction schedule ■ Solution - Confirmed specifications, created drawings, conducted prototypes, and mass-produced pre-processed PVC piping for delivery to the site. *For more details, please refer to the PDF document or feel free to contact us.
Inquire About This Product
basic information
【Results】 ■ On-site work time reduced from a minimum of 3 days to about 1 week ■ No need for material arrangement or inventory management, enabling efficient construction at the site by simply connecting joints ■ Reduced issues of noise, dust, and odors from on-site work ■ Decrease in waste such as offcuts due to reduced on-site processing *For more details, please refer to the PDF document or feel free to contact us.
Price range
Delivery Time
Applications/Examples of results
- Hydroponic supply and drainage piping related to plant factories - Others: Drainage piping for apartments, PVC piping included with unit products, pre-cut PVC pipes, etc. * For more details, please refer to the PDF materials or feel free to contact us.
catalog(3)
Download All CatalogsCompany information
Miyata Industrial Co., Ltd. manufactures products utilizing technology in resin processing and plastic processing. ■ PVC pipe processed products (pre-processed products, cut pipes, perforated pipes, bent pipes, half-split pipes, pipe joint assembly) ■ Sewage tank components (adjustment air valves, swing check valves MSC, special PVC fittings, aeration pipes, diffusers) ■ Water treatment-related products (measuring tanks, aeration pipes, diffusers, fluid carriers, contact materials) ■ Air conditioning duct-related products (volume dampers, vibration-proof joints, canvas joints, soft flexibles) We handle a wide variety of PVC processed products and plastic products. We mainly manufacture various products through the processing of rigid polyvinyl chloride pipes (cutting, drilling, bending, half-splitting, bonding, welding, pipe assembly). We also accommodate mass production and short delivery times at our manufacturing plants in Aichi Prefecture, Mie Prefecture, Fukuoka Prefecture, and Tochigi Prefecture. We strive daily to contribute to a wide range of customers by leveraging our technologies and products. Please feel free to contact us with any questions regarding production or requests for estimates.