Introducing our "Vertical Lathe" with a chuck diameter of φ1500 and equipped with a magnifying scale!
This is an introduction to the "horizontal lathe" we own. We have one unit manufactured by Kurashiki Machinery Co., Ltd. 【Equipment Information】 ■LF-75: 1 unit (introduced in April 1979) Please feel free to consult us when you need assistance. *For more details, please refer to the PDF document or feel free to contact us.
Inquire About This Product
basic information
【Equipment Information Details】 ■LF-75 Vibration on the bed: φ1500 Vibration on the cutting edge: φ2000×450 Vibration on the reciprocating table: φ1000 Chuck diameter: φ1500 with magnetic scale *For more details, please refer to the PDF document or feel free to contact us.
Price range
Delivery Time
Applications/Examples of results
For more details, please refer to the PDF document or feel free to contact us.
catalog(1)
Download All CatalogsCompany information
Our company provides a comprehensive system for the manufacturing of parts, from processing components for forging machines to the assembly and completion of various industrial machinery and food-related equipment. We are equipped with a wide range of facilities, primarily focusing on NC horizontal boring mills and horizontal machining centers, to meet the diverse needs of our customers.



![[Without slide bed] Powerful front lathe *Various options available](https://image.mono.ipros.com/public/product/image/080/2000011323/IPROS85938735371582895609.jpeg?w=280&h=280)
![[With slide bed] Powerful front lathe *Various options available](https://image.mono.ipros.com/public/product/image/682/2000011319/IPROS77261632478761087838.jpeg?w=280&h=280)
![[With slide bed] NC front lathe *Various options available](https://image.mono.ipros.com/public/product/image/445/2000011318/IPROS72604194659287898091.jpeg?w=280&h=280)
![Deburring Machine "Twin Baritor" [Eligible for Small and Medium Enterprise Productivity Investment Subsidy]](https://image.mono.ipros.com/public/product/image/6d3/2000308654/IPROS16685940644635288329.png?w=280&h=280)


![The first step in automating factories and warehouses starts with floor leveling [with case studies included].](https://image.mono.ipros.com/public/product/image/8e6/2001522448/IPROS11175175298099575604.png?w=280&h=280)